Operational Research and Aviation Management

Part II Procurement and Capital Investment Programmes

Published online by Cambridge University Press:  04 July 2016

P. A. Longton
Affiliation:
Business Operations Research Ltd
A. T. Williams
Affiliation:
Business Operations Research Ltd

Extract

The previous paper in this series described what operational research is and illustrated some of its methods. The succeeding articles are concerned with considering some of the problems in the different branches of the aviation industry and showing how OR may be profitably applied to them.

This paper and the next form a continuous narrative. They differ in that the first concentrates on capital investment programmes and the procurement of aircraft, while the programmes and the procurement of running an airline. In the first, a discussion of cost structure leads on to some detailed models. A further series of models forms the basis of the second.

Type
Research Article
Copyright
Copyright © Royal Aeronautical Society 1965

Access options

Get access to the full version of this content by using one of the access options below. (Log in options will check for institutional or personal access. Content may require purchase if you do not have access.)

References

1.Barry, W. S.Airline Management. Allen & Unwin Ltd, 1965.Google Scholar
2.Bell, G. E. Operational Research into Air Traffic Control. Journal of the Royal Aeronautical Society, Oct. 1949.CrossRefGoogle Scholar
3.Blackett, P. M. S. Quoted in Operation Research in the RAF. HMSO, 1963.Google Scholar
4.Blumstein, A. The Landing Capacity of a Runway. Opus Res 1959, pp 752763.CrossRefGoogle Scholar
5.Blumstein, A. The Operations Capacity of a Runway used for Landings and Take-offs. Proc 2nd Int Conf Opus Res, 1960.Google Scholar
6.Bowen, E. G.Delays in the Flow of Air Traffic. Journal of the Royal Aeronautical Society, 1948, 52, pp 251258.CrossRefGoogle Scholar
7.Bowman, E. H. and Fetter, R. B.Analysis for Production Management, D., Richard Irwin, Inc, 1957.Google Scholar
8.Dean, B. V.Replacement Theory in Progress in Operations Research. Vol. 1, ed. by Ackoff, R. L.John Wiley, 1963.Google Scholar
9.Lee, A. M.Transportation in Progress in Operations Re search. Vol. II, edited by Hertz, D. B. and Eddison, R. T.John Wiley & Sons, Inc, 1964.Google Scholar
10.Lee, A. M.Review of Operational Research in Airlines Proc 3rd Int Conf Opus Res 1963, pp 927932.Google Scholar
11.Mckean, R. N.Efficiency in Government through Systems Analysis. John Wiley & Sons, Inc, 1958.Google Scholar
12.Morgenthaler, G. W.Operations Research Applied to the National Ballistic Missile and Space Programs in Progress in Operations Research. Vol. II. John Wiley, 1964.Google Scholar
13.Novick, D. System and Total Force Cost Analysis US Air Force Project, Research Memorandum RM-2695. The Rand Corporation, 1961.Google Scholar
14.Pearcey, T. Delays in Landing of Air Traffic. Journal of the Royal Aeronautical Society, December 1948.CrossRefGoogle Scholar
15.Pestalozzi, G. Priority Rules for Runway Use. Opus Res, 1964, 12, pp 941950.Google Scholar
16.Quade, E. S. (Ed.). Analysis for Military Decisions. Rand McNally & Co, 1964.Google Scholar
17.Read, R. R. and Yoshikawa, T.Operations Analysis of Locating High Speed Runway Exits. Opus Res, 1962, 10.Google Scholar
18.Sealy, K. R.The Geography of Air Transport. Hutchinson, 1957.Google Scholar
19.Spear, R. D.Technical Aspects of Air Transport Management. McGraw-Hill Book Company, Inc, 1955.Google Scholar
20.Summerfield, J. R. A Model for Evaluating Fleets of Transport Aircraft. Proc 2nd Int Conf Opus Res, 1960.Google Scholar
21.Wheatcroft, S.The Economics of European Air Transport. Manchester University Press, 1956.Google Scholar
22.Wilkinson, K. G. Air Transport Engineering—The Task Ahead. To be published.Google Scholar