Hostname: page-component-7c8c6479df-8mjnm Total loading time: 0 Render date: 2024-03-19T07:08:55.471Z Has data issue: false hasContentIssue false

A repetitive 800 kA linear transformer drivers stage for Z-pinch driven fusion-fission hybrid reactor

Published online by Cambridge University Press:  09 July 2015

Chuan Liang*
Affiliation:
Institute of Nuclear Physics and Chemistry, Mianyang, China
Lin Zhou
Affiliation:
Institute of Nuclear Physics and Chemistry, Mianyang, China
Fengju Sun
Affiliation:
Northwest Institute of Nuclear Technology, Xi'an, China
Jiangtao Zeng
Affiliation:
Northwest Institute of Nuclear Technology, Xi'an, China
Mingjia Li
Affiliation:
Institute of Nuclear Physics and Chemistry, Mianyang, China
Zhen Wang
Affiliation:
Institute of Nuclear Physics and Chemistry, Mianyang, China
Zhenghong Li
Affiliation:
Institute of Nuclear Physics and Chemistry, Mianyang, China
Xianjue Peng
Affiliation:
China Academy of Engineering Physics, Mianyang, China
*
Address correspondence and reprint requests to: Liang Chuan, Laboratory of Advanced Nuclear energy, Institute of Nuclear Physics and Chemistry, Mianyang 621999, China. E-mail: inpc_lc@163.com
Rights & Permissions [Opens in a new window]

Abstract

This paper presents the design and tests of a repetitive 800 kA fast linear transformer driver (LTD) stage aimed for the Z-pinch driven fusion-fission hybrid reactor (Z-FFR).The LTD stage consists of 34 parallel basic resistor R, inductor L, and capacitor C (RLC) circuits each made up of two 100 kV/40 nF capacitors, a multi-stage gas switch and Metglas magnetic cores. The stage can deliver about 800 kA current pulse with rise time of 100 ns into the matched liquid resistive load at a repetitive frequency 0.1 Hz. A novel method to trigger the stage via a continuous internal trigger bus composed by a single cable has been proposed and demonstrated. The experimental results show that the new trigger method is feasible and reliable. A 140 kV, 25 ns rising time trigger pulse, and a 5.2 kA, 30 μs width pre-magnetization current pulse which can operate at a repetition rate 0.1 Hz were used in this stage to insure the LTD stage generating a 80 kV/800 kA current pulse every 10 s. A multi-stage gas switch that has a lifetime in excess of 10,000 shots and a jitter less than 3 ns one sigma agrees well with the demand of Z-FFR. The electrical behavior of the stage can be predicted from a simple RLC circuit, which can simplify the design of various LTD-based accelerators.

Type
Research Article
Copyright
Copyright © Cambridge University Press 2015 

1. INTRODUCTION

Z-Pinch driven fusion-fission hybrid reactor (Z-FFR) proposed by the research team of China Academy of Engineering Physics can be used for production of electricity with the advantages of safety, economy, permanence, and environment friendliness(Peng, Reference Peng2010; Peng & Wang, Reference Peng and Wang2014). The design fusion yield is 1.5 GJ per pulse with 6 pulses per minute. The energy gain of the fission blanket is more than 20 and the nuclear power of the Z-FFR is about 3000 megawatts. The Z-FFR concept uses a linear transformer driver (LTD) accelerator which can deliver tens of mega-ampere pulse current with width of 100 ns to a wire array Z-pinch load with repetitive frequency of 0.1 Hz, and a recyclable transmission line to connect the LTD driver to a high-yield fusion target inside a thick-liquid- wall power plant chamber.

LTD that was first conceived and developed at High Electronic Institute in Tomsk is a new pulsed power architecture that may dramatically reduce the cost and size of future pulsed-power accelerators (Kim et al., Reference Kim, Kovalchuk, Bastrikov, Dorakov, Volkov and Sinebryukhov2001; Reference Kim, Bastrikov, Volkov, Dorakov, Kovalchuk and Sinebryukhov2004). At Sandia National Laboratories, a 500 kA LTD cavity have been fired up to now, approximately 13,000 shots at repetition rate higher than 5 shots per minute without switch or capacitor failure (Mazarakis et al., Reference Mazarakis, Fowler, Mcdaniel, Olson, Rogowski, Sharpe, Struve, Stygar, Kim, Sinebryukhov, Gilgenbach and Gomez2007). In LTD, DC charged capacitors are discharged in parallel to provide a 100 ns wide power pulse to a load directly without any of the pulse compression hardware used in traditional pulsed-power accelerators. The biggest advantage of the LTD drivers is the possibility of a repetition rated operation. According to the capacitor specifications and switch pressurization and fast purging, LTD can reliably generate sequential current pulses with repetition rate 0.1 Hz which make LTD drivers to be an optimal choice for inertial fusion energy where the required repetition rate is estimated to be the same range (Mazarakis & Olson, Reference Mazarakis and Olson2006; Mazarakis et al., Reference Mazarakis, Fowler, Mcdaniel, Olson, Rogowski, Sharpe, Struve and Kim2006; Olson et al., Reference Olson, Mazarakis, Fowler, Sharpe, Smith, Turgeon, Langston, Pointon, Ottinger, Schumer, Welch, Rose, Genoni, Bruner, Thoma, Barkey, Guthrie, Kammer, Kulcinski, Kalinin, Kingsep, Nedoseev, Smirnov and Kim2007; Deng et al., Reference Deng, Wang, Xie, Zhou, Zou, Guo, Zhang, Li, Feng, Chen, Xia, Ji, Yuan, Song, Huang and Peng2014).

The basic unit of a LTD stage which is called a “brick” typically consists of two capacitors, a triggered gas switch, annular magnetic core, and a load which may be magnetically insulated transmission line (MITL) in vacuum, liquid resistive load or de-ionized water transmission line (Kim et al., Reference Kim, Mazarakis, Sinebryukhov, Kovalchuk, Visir, Volkov, Bayol, Bastrikov, Durakov, Frolov, Alexeenko, Mcdaniel, Fowler, Lechien, Olson, Stygar, Struve, Porter and Gilgenbach2009; LeChien et al., Reference Lechien, Mazarakis, Fowler, Stygar, Long, Mckee, Natoni, Porter, Androlewicz, Chavez, Feltz, Garcia, Guthrie, Mock, Montoya, Puissant, Smith, Wakeland, Ward, Van De Valde and Kim2009; Woodworth et al., Reference Woodworth, Fowler, Stoltzfus, Stygar, Sceiford and Mazarakis2011). Figure 1 shows a typical LTD brick. Two capacitors are charged to opposite polarities with a gas switch between their high-voltage outputs. When the switch is triggered and conducts current, a voltage pulse is induced on the opposite ends of the capacitors. This voltage pulse attempts to drive current around a loop formed by the metallic case of the LTD brick. The annular magnetic cores, however, block current from flowing in this loop until the magnetic cores saturate. This results in a large, fast-rising voltage pulse been impressed on the load in the center of the stage. Losses in the annular magnetic cores can reduce the peak power on the load by 10–20% depending on the detail configurations of the system.

Fig. 1. Schematic of a basic LTD brick.

Normally, multiple bricks are stacked in parallel around a central load to form a LTD stage which can deliver more than 1 MA pulse current to the load with 100 ns width. Multiple stages can be stacked in series and in parallel, to generate higher voltage and higher current pulse into the load (Leckbee et al., Reference Leckbee, Maenchen, Johnson, Portillo, VanDeValde, Rose and Oliver2006; Reference Leckbee, Oliver, Bruner, Joshua, Rose, Welch, Johnson and Cordova2008; Reference Leckbee, Cordova, Oliver, Webb, Toury, Caron, Rosol, Bui, Romero and Ziska2011; Stygar et al., Reference Stygar, Cuneo, Headley, Ives, Leeper, Mazarakis, Olson, Porter, Wagoner and Woodworth2007; Savage et al., Reference Savage, Mazarakis, Lechien, Stoltzfus, Stygar, Fowler, Madrid, Miller and Rose2011).

In Section 2 of this paper we describe the design of the 0.1 Hz, 800 kA, and 100 ns fast LTD stage developed at Institute of Nuclear Physics and Chemistry (INPC), China. In Section 3 we present tests of the LTD stage with liquid resistive load. The supporting systems such as control system, pre-magnetization system, triggering system, and novel trigger way will be described too. In addition, the electrical performance and experimental results of the LTD stage are discussed and explained in detail.

2. DESIGN OF FAST 0.1 HZ 800 KA LTD STAGE

The design of the 0.1 Hz 800 kA LTD stage is shown in Figure 2. The outside diameter of the stage is 2560 mm, the length along the main axis is 214 mm. Inside the stage is located the capacitor bank with the switches, charge and trigger air-core inductance, and the Metglas magnetic cores. The capacitor bank is made up of 68 storage capacitors that are arranged as 34 pairs. The capacitors in each pair are charged in opposite polarity up to ±100 kV and switched into the load by closing the multi-spark gap switch. The China XIMAI double ended capacitor (40 nF, 100 kV, and 30 nH) used in the stage is compact with length of 18.2 cm, width of 16 cm, and thickness of 7 cm. The four-spark gaps switch developed at Northwest Institute of Nuclear Technology (NINT) has been used in our stage (Liang et al., Reference Liang, Sun, Qiu, Zhang, Zeng, Cong and Yin2006; Liu et al., Reference Liu, Liang, Sun, Jiang, Li, Sun and Qiu2009). The switches shown in Figure 3 are relatively small with diameter of 9.4 cm and height of 12.5 cm. They have four 7 mm gaps. The DC voltage is distributed between four switch gaps with a corona discharge. The switches can operate reliably with dry air at a pressure of 300 kPa for ±100 kV charging voltage triggered by 140 kV, 25 ns rising time pulses.

Fig. 2. Design of 0.1 Hz LTD stage with a liquid resistor load. (a) Side section view of the stage. (b) Overview of the stage.

Fig. 3. Four-spark gaps switch developed by NINT, China.

In the stage the 1.65 m outer diameter Metglas magnetic core had four separate rings, each ring being wound with a 25 μm thick, 30 mm wide 2605SA1 Fe-based amorphous tape sandwiched in a 1 μm thick SiO2 coat insulation. The rings are molded into a glass fiber compound to stabilize the turns and isolate the rings from each other. The glass fiber encapsulation of each ring has a size of 1.65 m outer diameter, 1.4 m inner diameter, and 30 mm height. The magnetic induction at saturation of 2605SA1 is B S = 1.5 T at H = 80 A/m, the residual induction is B R = 1.2 T. The total cross-section of the Metglas core of four rings is 73 cm2. The volt-second integral of the entire core is VSPC = 19.7 mVs with passive pre-magnetizing (ΔB = 2.7 T). In ±100 kV shots, the total volt-second product impressed across the magnetic cores may be 15 mVs estimated by square pulse with 150 ns width, well below the 19.7 mVs product of the Metglas cores.

The set of two capacitors, the switch, and the buses connecting the capacitors from one side with the switch and from the opposite side with the azimuthally gap is called brick and represents the basic element of the stage. All the 34 bricks in the stage are connected in parallel and located evenly in a circular array around the axis.

In order to achieve a fast rise time output pulse, the inductance of the brick must be kept as low as possible. An estimated inductance of the brick is about 270 nH which is the sum of the two capacitor inductances (60 nH), the switch inductance (120 nH), and the inductance of the circuit bushes (90 nH). Then according to the formula of a simple resistor-inductor-capacitor (RLC) circuit, t rise = 1.21(LC)0.5 and R matched = (L/C)0.5 (Mazarakis & Olson, Reference Mazarakis and Olson2006; Mazarakis et al., Reference Mazarakis, Fowler, Kim, Sinebryukhov, Rogowski, Sharpe, McDaniel, Olson, Porter, Struve, Stygar and Woodworth2009), the rising time and matched load of the stage is, respectively, ~89 ns and ~0.11 Ω.

The inductance of each charging isolated inductor is 6 μH and the inductance of each trigger isolated inductor is 4 μH. A novel method to trigger the stage via a continuous internal trigger bus composed by a single cable has been developed. The trigger pulse for the stage was generated by discharging two 20 nF capacitors to the same voltage to the brick in parallel by closing a four-gap switch. The trigger pulse reaches the 34 switches synchronously via a transmission line.

3. TESTS OF FAST 0.1 HZ 800 KA LTD STAGE

3.1. Experimental Results of the LTD Stage

In the tests of the stage, 36 liquid resistors are connected as load in parallel and located in a circular array around the axis. The LTD stage with all the components except the top flange removed was shown in Figure 4. The stage was filled with transformer oil during operation. The oil was filled and drained through filters that removed particles and moisture. It is important and beneficial for high voltage insulation to draw off all air bubbles in the stage. During normal operation, the top capacitors are charged to positive voltage and the bottom capacitors are charged to negative voltage.

Fig. 4. 0.1 Hz, 800 kA, and 100 ns LTD stage with the top flange removed. The 34 switches, charging and trigger isolated inductors, Metglas magnetic cores, and the top capacitors are also shown. 36 liquid resistive loads in parallel are concealed in the center of the LTD stage.

In order to operate at 0.1 Hz, we developed the supporting systems such as capacitor charging, switch pressurization, switch vacuum purging, pre-magnetization, and triggering system. All of these have exceeded the 0.1 Hz repetition rate and automated controlled by a computer via optical fiber communication. All the supporting systems operate one shot with the sequence described below within 10 s, shown in Figure 5. In the first 5 s period, pre-magnetization system will be charged by a ±50 kV/10 mA constant current power supply; switches in stage and trigger generator will be purged and pressurized; at the fifth second the pre-magnetization system generates a 5 kA/30 μs current pulse shown in Figure 6 to set the magnetic cores. The following 5 s period, switches in pre-magnetization system will be purged and pressurized; and the same period all the capacitors in stage and trigger brick will be charged to ±80 kV separately by a ±100 kV/50 mA constant current power supply; at the tenth second the trigger system generates a 140 kV, 25 ns rising time pulse to trigger all the 34 switches in the stage synchronously. Then the stage generates about 800 kA, 100 ns rising time current pulse shown in Figure 7 into a matched load. If conditions are normal, the sequence repeats every 10 s.

Fig. 5. Time sequence control of the LTD stage.

Fig. 6. 24 shots sequential output pulse currents to set the magnetic cores with the repetition rate 0.1 Hz. The liquid resistive load in series was used as a damper in the circuit of the pre-magnetization system. And along with operating with repetition rate 0.1 Hz, the value of water resistance will gradually diminish because of the rising temperature. Then the peak pulse current into the liquid resistive load will gradually increase.

Fig. 7. 24 shots sequential output pulse currents of the LTD stage into near matched load with the repetition rate 0.1 Hz. The capacitors of each brick were charged to ±80 kV and the liquid resistive load is about 0.1 Ω; the peak pulse current is about 800 kA and peak power into the load is about 64 GW.

3.2. Four-spark Gap Switch

Figure 8 shows a schematic of a brick of the LTD stage using the four-spark gap switch. Two 100 kV/40 nF capacitors are connected with a four gaps switch and the other ends of the capacitors are connected simply to each other through a matched liquid resistive load. A Rogowski coil is placed between the load and ground to monitor the current in the circuit. A resistive divider monitors voltage across the resistive loads to allow us to verify that the value of the resistive loads has not shifted.

Fig. 8. The schematic of testing the four-spark gap switch using a brick of LTD stage.

The capacitors are charged to ±80 kV, 80% of the full voltage. A positive electrical trigger was applied to the mid-plane of the switch. The trigger pulse was a nominal 140 kV pulse with a 25 ns rising time. The switch-testing apparatus can operate at repetition rate 0.1 Hz automatically controlled by a computer. The switch can operate very well with 200 kPa dry air. The delay, jitter, lifetime, and the inductance of the switch were also tested. The switch was fired more than 10,000 shots with a repetition rate of 6 shots per minute without failure. The trigger delay time and jitter (one sigma) are about 40 and 2.5 ns, respectively.

Figure 9 shows a typical pulse current waveform. The brick inductance, including the switch inductance, can also be estimated according to the output current waveform. The period of the pulse current is about 464 ns. Then the total inductance of the brick can be calculated to be 272.7 μH that agree well with the estimated value in Section 2.

Fig. 9. Typical waveform of the output current of the brick with about 3 Ω liquid resistive load.

3.3. Novel Trigger Method

Normally a trigger cable can deliver a trigger pulse to trigger six to eight switches of the LTD stage (LeChien et al., Reference Lechien, Mazarakis, Fowler, Stygar, Long, Mckee, Natoni, Porter, Androlewicz, Chavez, Feltz, Garcia, Guthrie, Mock, Montoya, Puissant, Smith, Wakeland, Ward, Van De Valde and Kim2009; Zhou et al., Reference Zhou, Deng, Chen, Dai, Wang, Xie, Feng and Yang2010). So it may need at least four trigger cables to fire the LTD stage which contains 34 bricks. In order to simplify the trigger system, a novel method to trigger the stage via a continuous internal trigger bus composed by a single cable has been developed. The trigger brick is charged to the same voltage as the stage, and it comprises 2, 100 kV, 20 nF capacitors and a, 200 kV, air filled switch (similar to the stage switches, except triggered differently).

Figure 10 shows the sketch of novel trigger method. The trigger pulse generated by trigger brick is firstly divided into two and reached the point A and B via a quarter angle transmission line. And then it is divided into four and arrived the point C, D, E, and F of the trigger bus simultaneously by transmitting another eighth circle distance. The overview of the trigger pulse transferring net is shown in Figure 11. The red line is the angle transmission line, and the outer metal ring is the trigger bus. In the tests, two trigger ways using one trigger cable and four trigger cables to trigger the LTD stage separately are compared. The results show that using one trigger cable to trigger the LTD stage is as reliable and efficient as using four trigger cables. It is very inspiring and important to simplify the trigger system of future high current petawatt-class z-pinch accelerators (Stygar et al., Reference Stygar, Cuneo, Headley, Ives, Leeper, Mazarakis, Olson, Porter, Wagoner and Woodworth2007).

Fig. 10. Sketch of a novel trigger method.

Fig. 11. Overview of the trigger pulse transferring net.

3.4. Parameters of the LTD and Discussion

In the tests, the synchronizer DG535 generates a 5 V Transistor-Transistor Logic (TTL) synchronous pulse to start the trigger system of the LTD stage. The trigger system produces a 140 kV, 25 ns rising time pulse after 1.34 μs to trigger the LTD stage with jitter time 21 ns. Then the LTD stage generates an 800 kA, 100 ns rising time, 100 ns width current pulse into the near matched load with delay time 190 ns. Figure 12 shows the waveform of shot 2555. The period of the pulse current is 565 ns. The equivalent capacitance of the stage is 680 nF. Then the equivalent inductance of the stage is 11.9 nH calculated by formula T = 2π(LC)0.5 which is higher than the value 8 nH estimated by 34 bricks in parallel. So the inductance of load area which has a big contribution to equivalent inductance of the LTD stage is about 3.9 nH. So decreasing the inductance of the power transmission and load area is beneficial to increase the peak current of the LTD stage. In fact, considering the inductance of the load area the matched load should be 0.13 Ω higher than the 0.1 Ω in tests. Therefore the LTD stage can deliver about 840 kA current pulse into a matched load in ±100 kV shot.

Fig. 12. The LTD stage output waveform of shot 2555. The capacitors of each brick were charged to ±80 kV and the liquid resistive load is about 0.1 Ω.

4. CONCLUSION

In the present work the fast 800 kA LTD stage built with 34 separate bricks has been developed and tested in INPC, China. The power pulse delivered to a near matched load 0.1 Ω has a peak value of 64 GW and a rising time of 100 ns. The 800 kA LTD stage was tested with resistive load. A novel trigger way in which only one trigger cable triggers the stage has been proposed and demonstrated the same reliability and efficiency as using four trigger cables. The experimental results are in excellent agreement with numerical simulations. The LTD stage with brick inductance 272 nH and load inductance 3.9 nH can deliver an 840 kA, 100 ns rising time, and 100 ns width pulse current into a matched load 0.13 Ω with a repetition rate 0.1 Hz. Up to now the stage has been fired approximately 10,000 shots and more than 4000 shots are fired at repetition rate, 6 shots per minute. Tests with vacuum self-MITL are undergoing, and further results will be presented in future paper.

ACKNOWLEDGEMENTS

The authors are deeply indebted to their colleagues at the Institute of Nuclear Physics and Chemistry at Mianyang, China, and the Northwest Institute of Nuclear Technology at Xi'an, China. This work was supported by the National Natural Science Foundation of China (Grant Nos. 11305155, 11475153, and 11135007).

References

REFERENCES

Deng, J.J., Wang, M., Xie, W.P., Zhou, L.J., Zou, W.K., Guo, F., Zhang, L., Li, F., Feng, S.P., Chen, L., Xia, M.H., Ji, C., Yuan, J.Q., Song, S.Y., Huang, X.B. & Peng, X.J. (2014). Super-power repetitive Z-pinch driver for fusion-fission reactor. High Power Laser Part. Beams 26, 100201.CrossRefGoogle Scholar
Kim, A.A., Bastrikov, A.N., Volkov, S.N., Dorakov, V.G., Kovalchuk, B.M. & Sinebryukhov, V.A. (2004). 100GW fast LTD stage. Proc. 10th Symp. on High Current Electronics, pp. 141144.Google Scholar
Kim, A.A., Kovalchuk, B.M., Bastrikov, A.N., Dorakov, V.G., Volkov, S.N. & Sinebryukhov, V.A. (2001). 100 ns current rise time LTD stage. Proc. 13th IEEE Int. Pulsed Power Conf., pp. 294299.CrossRefGoogle Scholar
Kim, A.A., Mazarakis, M.G., Sinebryukhov, V.A., Kovalchuk, B.M., Visir, V.A., Volkov, S.N., Bayol, K., Bastrikov, A.N., Durakov, V.G., Frolov, S.V., Alexeenko, V.M., Mcdaniel, D.H., Fowler, W.E., Lechien, K., Olson, C., Stygar, W.A., Struve, K.W., Porter, J. & Gilgenbach, R.M. (2009). Development and tests of fast 1-MA linear transformer driver stages. Phys. Rev. Spec. Top. – Ac. Beams 12, 050402.CrossRefGoogle Scholar
Lechien, K., Mazarakis, M., Fowler, W., Stygar, W., Long, F., Mckee, R., Natoni, G., Porter, J., Androlewicz, K., Chavez, T., Feltz, G., Garcia, V., Guthrie, D., Mock, R., Montoya, T., Puissant, J., Smith, A., Wakeland, P., Ward, K., Van De Valde, D. & Kim, A. (2009). A 1-MV, 1-MA, 0.1-Hz linear transformer driver utilizing an internal water transmission line. Proc 17th IEEE int. Pulsed Power Conf., pp. 11861191.Google Scholar
Leckbee, J., Cordova, S., Oliver, B., Webb, T., Toury, M., Caron, M., Rosol, R., Bui, B., Romero, T. & Ziska, D. (2011). Linear transformer driver (LTD) research for radiographic applications. Proc 18th IEEE Int. Pulsed Power Conf., pp. 614618.CrossRefGoogle Scholar
Leckbee, J.J., Maenchen, J.E., Johnson, D.L., Portillo, S., VanDeValde, D.M., Rose, D.V. & Oliver, B.V. (2006). Design, simulation, and fault analysis of a 6.5-MV LTD for flash X-ray radiography. IEEE Trans. Plasma Sci. 34, 18881899.CrossRefGoogle Scholar
Leckbee, J.J., Oliver, B.V., Bruner, N., Joshua, J., Rose, D.V., Welch, D.R., Johnson, D.L. & Cordova, S.R. (2008). Design of a 7-MV linear transformer driver (LTD) for down-hole flash X-Ray radiography. Sandia Report No.2008–6142.Google Scholar
Liang, T.X., Sun, C.X., Qiu, A.C., Zhang, Z., Zeng, J.T., Cong, P.T. & Yin, J.H. (2006). Multi-gap multi-channel 200 kV gas spark switch for fast LTD. High Volt. Eng. 32, 5658.Google Scholar
Liu, X.D., Liang, T.X., Sun, F.J., Jiang, X.F., Li, J., Sun, F. & Qiu, A.C. (2009). A multi- gap multi-channel gas switch for the linear transformer driver. Plasma Sci. Technol. 11, 725729.Google Scholar
Mazarakis, M.G., Fowler, W.E., Kim, A.A., Sinebryukhov, V.A., Rogowski, S.T., Sharpe, R.A., McDaniel, D.H., Olson, C.L., Porter, J.L., Struve, K.W., Stygar, W.A. & Woodworth, J.R. (2009). High current, 0.5-MA, fast, 100-ns, linear transformer driver experiments. Phys. Rev. Spec. Top. – Ac. Beams 12, 050401.CrossRefGoogle Scholar
Mazarakis, M.G., Fowler, W.E., Mcdaniel, D.H., Olson, C.L., Rogowski, S.T., Sharpe, R.A., Struve, K.W. & Kim, A.A. (2006). A 1-MA LTD cavities building blocks for next generation ICF/IFE. Proc. IEEE Int. Conf. on Magagauss Magnetic Field Generation and Related Topics, pp. 523528.CrossRefGoogle Scholar
Mazarakis, M.G., Fowler, W.E., Mcdaniel, D.H., Olson, C.L., Rogowski, S.T., Sharpe, R.A., Struve, K.W., Stygar, W.A., Kim, A.A., Sinebryukhov, V.A., Gilgenbach, R.M. & Gomez, M.R. (2007). High current linear transformer driver (LTD) experiments. Proc. 16th IEEE Int. Pulsed Power Conf., pp. 222225.Google Scholar
Mazarakis, M.G. & Olson, C.L. (2006). A New High Current Fast 100 ns LTD Based Driver for Z-pinch IFE at Sandia. Proc 21st IEEE Symp. on Fusion Engineering, pp. 117120.Google Scholar
Olson, C.L., Mazarakis, M.G., Fowler, W.E., Sharpe, R.A., Smith, D.L., Turgeon, M.C., Langston, W.L., Pointon, T.D., Ottinger, P.F., Schumer, J.W., Welch, D.R., Rose, D.V., Genoni, T.C., Bruner, N.L., Thoma, C., Barkey, M.E., Guthrie, M., Kammer, D.C., Kulcinski, G.L., Kalinin, Y.G., Kingsep, E.S., Nedoseev, S.L., Smirnov, V.P. & Kim, A. (2007). Recyclable transmission line (RTL) and linear transformer driver (LTD) development for Z-Pinch inertial fusion energy (Z-IFE) and high yield. Sandia Report No. 2007–0059.Google Scholar
Peng, X.J. (2010). Z-pinch fusion-fission hybrid reactor: The energy technology road with great competitive power. South west University Sci. Technol. 25, 14.Google Scholar
Peng, X.J. & Wang, Z. (2014). Conceptual research on z-pinch driven fusion-fission hybrid reactor. High Power Laser Part. Beams 26, 090201.Google Scholar
Savage, M.E., Mazarakis, M.G., Lechien, K.R., Stoltzfus, B.S., Stygar, W.A., Fowler, W.E., Madrid, E.A., Miller, C.L. & Rose, D.V. (2011). Temporally shaped current pulses on a two-cavity linear transformer driver system. Proc 18th IEEE Int. Pulsed Power Conf., pp. 844849.CrossRefGoogle Scholar
Stygar, W.A., Cuneo, M.E., Headley, D.I., Ives, H.C., Leeper, R.J., Mazarakis, M.G., Olson, C.L., Porter, J.L., Wagoner, T.C. & Woodworth, J.R. (2007). Architecture of petawatt-class z-pinch accelerators. Phys. Rev. Spec. Top. – Ac. Beams 10, 030401.CrossRefGoogle Scholar
Woodworth, J.R., Fowler, W.E., Stoltzfus, B.S., Stygar, W.A., Sceiford, M.E. & Mazarakis, M.G. (2011). Compact 810 kA linear transformer driver cavity. Phys. Rev. Spec. Top. – Ac. Beams 14, 040401.CrossRefGoogle Scholar
Zhou, L.J., Deng, J.J., Chen, L., Dai, Y.M., Wang, M., Xie, W.P., Feng, S.P. & Yang, L.B. (2010). Design of 1MA linear transformer driver stage. High Power Laser Part. Beams 22, 465468.CrossRefGoogle Scholar
Figure 0

Fig. 1. Schematic of a basic LTD brick.

Figure 1

Fig. 2. Design of 0.1 Hz LTD stage with a liquid resistor load. (a) Side section view of the stage. (b) Overview of the stage.

Figure 2

Fig. 3. Four-spark gaps switch developed by NINT, China.

Figure 3

Fig. 4. 0.1 Hz, 800 kA, and 100 ns LTD stage with the top flange removed. The 34 switches, charging and trigger isolated inductors, Metglas magnetic cores, and the top capacitors are also shown. 36 liquid resistive loads in parallel are concealed in the center of the LTD stage.

Figure 4

Fig. 5. Time sequence control of the LTD stage.

Figure 5

Fig. 6. 24 shots sequential output pulse currents to set the magnetic cores with the repetition rate 0.1 Hz. The liquid resistive load in series was used as a damper in the circuit of the pre-magnetization system. And along with operating with repetition rate 0.1 Hz, the value of water resistance will gradually diminish because of the rising temperature. Then the peak pulse current into the liquid resistive load will gradually increase.

Figure 6

Fig. 7. 24 shots sequential output pulse currents of the LTD stage into near matched load with the repetition rate 0.1 Hz. The capacitors of each brick were charged to ±80 kV and the liquid resistive load is about 0.1 Ω; the peak pulse current is about 800 kA and peak power into the load is about 64 GW.

Figure 7

Fig. 8. The schematic of testing the four-spark gap switch using a brick of LTD stage.

Figure 8

Fig. 9. Typical waveform of the output current of the brick with about 3 Ω liquid resistive load.

Figure 9

Fig. 10. Sketch of a novel trigger method.

Figure 10

Fig. 11. Overview of the trigger pulse transferring net.

Figure 11

Fig. 12. The LTD stage output waveform of shot 2555. The capacitors of each brick were charged to ±80 kV and the liquid resistive load is about 0.1 Ω.