Skip to main content Accessibility help
×
Hostname: page-component-848d4c4894-8kt4b Total loading time: 0 Render date: 2024-06-27T06:33:10.484Z Has data issue: false hasContentIssue false

Part III - People

Published online by Cambridge University Press:  08 June 2017

Shankar Sankaran
Affiliation:
University of Technology, Sydney
Ralf Müller
Affiliation:
BI Norwegian Business School
Nathalie Drouin
Affiliation:
Université du Québec à Montréal
Get access

Summary

Image of the first page of this content. For PDF version, please use the ‘Save PDF’ preceeding this image.'
Type
Chapter
Information
Publisher: Cambridge University Press
Print publication year: 2017

Access options

Get access to the full version of this content by using one of the access options below. (Log in options will check for institutional or personal access. Content may require purchase if you do not have access.)

References

References

Alvesson, M. & Karreman, D. (2000). Varieties of discourse: On the study of organizations through discourse analysis. Human Relations, 53(9), 11251149.Google Scholar
Alvesson, M. & Kärreman, D. (2007). Unraveling HRM: Identity, Ceremony, and Control in a management consulting firm. Organization Science, 18(4), 711723.Google Scholar
Appelbaum, E., Bailey, T., Berg, P., & Kalleberg, A. (2000). Manufacturing Competitive Advantage: The Effects of High Performance Work Systems on Plant Performance and Company Outcomes: Ithaca, NY: Cornell University Press.Google Scholar
Arthur, M. B. & DeFillippi, R. J. (1998). Paradox in project-based enterprise: The case of film making. California Management Review, 25.Google Scholar
Asquin, A., Garel, G., & Picq, T. (2010). When project-based management causes distress at work. International Journal of Project Management, 28(2), 166172. doi: 10.1016/j.ijproman.2009.08.006.Google Scholar
Aust, I., Brandl, J., & Keegan, A. (2015). State-of-the-art and future directions for HRM from a paradox perspective: Introduction to the Special Issue. Zeitschrift für Personalforschung, 29(3/4), 194.Google Scholar
Bakker, R. M. (2010). Taking stock of temporary organizational forms: A systematic review and research agenda. International Journal of Management Reviews, 12(4), 466486.Google Scholar
Ballesteros-Pérez, P., González-Cruz, M. C., & Fernández-Diego, M. (2012). Human resource allocation management in multiple projects using sociometric techniques. International Journal of Project Management, 30(8), 901913.Google Scholar
Borg, E., & Söderlund, J. (2015). Liminality competence: An interpretative study of mobile project workers’ conception of liminality at work. Management Learning, 3(46), 260279.Google Scholar
Boselie, P., Brewster, C., & Paauwe, J. (2009). In search of balance–managing the dualities of HRM: an overview of the issues. Personnel Review, 38(5), 461471.Google Scholar
Bowen, D. E., & Ostroff, C. (2004). Understanding HRM-firm performance linkages: The role of the “strength” of the HRM system. Academy of Management Review, 29(2), 203221.Google Scholar
Boxall, P., & Purcell, J. (2011). Strategy and Human Resource Management, 3rd ed. Basingstoke: Palgrave Macmillan Ltd.Google Scholar
Bredin, K. (2008). People capability of project-based organisations: A conceptual framework. International Journal of Project Management, 26(5), 566576.Google Scholar
Bredin, K. & Söderlund, J. (2011). The HR quadriad: a framework for the analysis of HRM in project-based organizations. The International Journal of Human Resource Management, 22(10), 22022221.Google Scholar
Bredin, K. & Söderlund, J. (2013). Human Resource Management in Project-Based Organizations: The HR Quadriad Framework: Palgrave Macmillan.Google Scholar
Bredin, K. & Söderlund, J. (2013). Project managers and career models: An exploratory comparative study. International Journal of Project Management, 31(6), 889902.Google Scholar
Bredin, K. & Söderlund, J. (2014). Leading and managing projects. In Klimoski, R. J., Dugan, B. A., Messikomer, C., & Chiocchio, F. (Eds.). Advancing Human Resource Project Management, 350382.Google Scholar
Brière, S., Proulx, D., Flores, O. N., & Laporte, M. (2015). Competencies of project managers in international NGOs: Perceptions of practitioners. International Journal of Project Management, 33(1), 116124. 10.1016/j.ijproman.2014.04.010Google Scholar
Buganza, T., Kalchschmidt, M., Bartezzaghi, E., & Amabile, D. (2013). Measuring the impact of a major project management educational program: The PMP case in Finmeccanica. International Journal of Project Management, 31(2), 285298.Google Scholar
Calamel, L., Defélix, C., Picq, T., & Retour, D. (2012). Inter-organisational projects in French innovation clusters: The construction of collaboration. International Journal of Project Management, 30(1), 4859.CrossRefGoogle Scholar
Costa, A. P. C. S. (2013). Decision model for allocating human resources in information system projects. International Journal of Project Management, 31(1), 100108.Google Scholar
Crawford, L., French, E., & Lloyd-Walker, B. (2013). From outpost to outback: Project career paths in Australia. International Journal of Project Management, 31(8), 11751187.Google Scholar
Dainty, A., Raidén, A., & Neale, R. (2009). Incorporating employee resourcing requirements into deployment decision making. Project Management Journal, 40(2), 718.Google Scholar
Dany, F., Guedri, Z., & Hatt, F. (2008). New insights into the link between HRM integration and organizational performance: The moderating role of influence distribution between HRM specialists and line managers. The International Journal of Human Resource Management, 19(11), 20952112.Google Scholar
Deetz, S. (1996). Crossroads-describing differences in approaches to organization science: Rethinking Burrell and Morgan and their legacy. Organization Science, 7(2), 191207.CrossRefGoogle Scholar
Delbridge, R. & Keenoy, T. (2010). Beyond managerialism? The International Journal of Human Resource Management, 21(6), 799817.Google Scholar
Den Hartog, D. N., De Hoogh, A. H., & Keegan, A. (2007). The interactive effects of belongingness and charisma on helping and compliance. Journal of Applied Psychology, 92(4), 1131.CrossRefGoogle ScholarPubMed
Ehnert, I. (2009). Sustainable Human Resource Management: A Conceptual and Exploratory Analysis from a Paradox Perspective. Berlin: Physica-Verlag.Google Scholar
Ehrnrooth, M. & Björkman, I. (2012). An integrative HRM process theorization: Beyond signalling effects and mutual gains. Journal of Management Studies, 49(6), 11091135.CrossRefGoogle Scholar
Eskerod, P. & Jepsen, A. L. (2005). Staffing renewal projects by voluntary enrolment. International Journal of Project Management, 23(6), 445453.Google Scholar
Fairclough, N. (2003). Analysing Discourse: Textual Analysis for Social Research: Psychology Press.Google Scholar
Foss, N. J., Minbaeva, D. B., Pedersen, T., & Reinholt, M. (2009). Encouraging knowledge sharing among employees: How job design matters. Human Resource Management, 48(6), 871893.Google Scholar
Geare, A., Edgar, F., McAndrew, I., Harney, B., Cafferkey, K., & Dundon, T. (2014). Exploring the ideological undercurrents of HRM: Workplace values and beliefs in Ireland and New Zealand. The International Journal of Human Resource Management, 25(16), 22752294.Google Scholar
Godard, J. (2010). What is best for workers? The implications of workplace and human resource management practices revisited. Industrial Relations: A Journal of Economy and Society, 49(3), 466488.Google Scholar
Godard, J. (2014). The psychologisation of employment relations? Human Resource Management Journal, 24(1), 118. doi: 10.1111/1748-8583.12030.Google Scholar
Grabher, G. (2004). Temporary architectures of learning: Knowledge governance in project ecologies. Organization Studies, 25(9), 14911514. doi: 10.1177/0170840604047996.CrossRefGoogle Scholar
Greenwood, M. (2013). Ethical analyses of HRM: A review and research agenda. Journal of Business Ethics, 114(2), 355366.Google Scholar
Guest, D. E. & Woodrow, C. (2012). Exploring the boundaries of human resource managers’ responsibilities. Journal of Business Ethics, 111(1), 109119.CrossRefGoogle Scholar
Hodgson, D. & Cicmil, S. (2006). Making Projects Critical. Basingstoke: Palgrave Macmillan.Google Scholar
Hölzle, K. (2010). Designing and implementing a career path for project managers. International Journal of Project Management, 28(8), 779786. doi: 10.1016/j.ijproman.2010.05.004.Google Scholar
Hovmark, S. & Nordqvist, S. (1996). Project organization: Change in the work atmosphere for engineers. International Journal of Industrial Ergonomics, 17(5), 389398. doi: http://dx.doi.org/10.1016/0169-8141(94)00115-4.Google Scholar
Huemann, M. (2007). Ensure project success before the project starts! Paper presented at the IPMA Young Crew Conference, Cracow.Google Scholar
Huemann, M. (2010). Considering human resource management when developing a project-oriented company: Case study of a telecommunication company. International Journal of Project Management, 28(4/2010), 361369.Google Scholar
Huemann, M. (2013). HRM in the Project-Oriented Company. WU Vienna, Vienna.Google Scholar
Huemann, M. (2015). Human Resource Management in the Project-Oriented Organization: Towards a Viable System for Project Personnel. Aderlshot: Gower.Google Scholar
Huemann, M., Keegan, A., & Turner, R. (2007). Human resource management in the project-oriented company: A review. International Journal of Project Management, 25(3), 315323.Google Scholar
Jackson, S., Schuler, R., & Werner, S. (2011). Managing human resources: Cengage Learning.Google Scholar
Jones, C. & DeFillippi, R. J. (1996). Back to the future in film: Combining industry and self-knowledge to meet the career challenges of the 21st century The Academy of Management Executive (1993–2005), 10(4), 89103.Google Scholar
Kang, S. C., Snell, S. A., & Swart, J. (2012). Options-based HRM, intellectual capital, and exploratory and exploitative learning in law firms’ practice groups. Human Resource Management, 51(4), 461485.CrossRefGoogle Scholar
Keegan, A. & Boselie, P. (2006). The lack of impact of dissensus inspired analysis on developments in the field of human resource management. Journal of Management Studies, 43(7), 14911511. doi: 10.1111/j.1467-6486.2006.00638.x.Google Scholar
Keegan, A. & Den Hartog, D. N. (2004). Transformational leadership in a project-based environment: A comparative study of the leadership styles of project managers and line managers. International Journal of Project Management, 22(8), 609617.Google Scholar
Keegan, A. & Francis, H. (2010). Practitioner talk: The changing textscape of HRM and emergence of HR business partnership. The International Journal of Human Resource Management, 21(6), 873898. doi: 10.1080/09585191003729341.Google Scholar
Keegan, A., Huemann, M., & Turner, R. (2012). Beyond the line: Exploring the HRM responsibilities of line managers, project managers and the HRM department in four project-oriented companies in the Netherlands, Austria, the UK and the USA. The International Journal of Human Resource Management, 23(15), 30853104.Google Scholar
Keegan, A. & Turner, R. (2001). Quantity versus quality in project-based learning practices. Management Learning, 32, 7798.Google Scholar
Keegan, A. & Turner, R. (2002). The management of innovation in project-based firms. Long Range Planning, 35(4), 367388.Google Scholar
Keegan, A. & Turner, R. (2003). Managing human resources in the project-based organization. In Turner, J. R. (Ed.), People in Project Management. Aldershot: Gower.Google Scholar
Kramar, R. (2014). Beyond strategic human resource management: is sustainable human resource management the next approach? The International Journal of Human Resource Management, 25(8), 10691089.Google Scholar
Kroon, B. & Paauwe, J. (2014). Structuration of precarious employment in economically constrained firms: The case of Dutch agriculture. Human Resource Management Journal, 24(1), 1937.Google Scholar
Lai, D. N., Liu, M., & Ling, F. Y. (2011). A comparative study on adopting human resource practices for safety management on construction projects in the United States and Singapore. International Journal of Project Management, 29(8), 10181032.Google Scholar
Larsen, H. H. (2002). Oticon: Unorthodox project-based management and careers in a “spaghetti organization.” Human Resource Planning, 25(4), 3037.Google Scholar
Larsen, H. H. & Brewster, C. (2003). Line management responsibility for HRM: What is happening in Europe? Employee Relations, 25(3), 228244.Google Scholar
Laslo, Z. (2010). Project portfolio management: An integrated method for resource planning and scheduling to minimize planning/scheduling-dependent expenses. International Journal of Project Management, 28(6), 609618.Google Scholar
Lengnick-Hall, M. L., Lengnick-Hall, C. A., Andrade, L. S., & Drake, B. (2009). Strategic human resource management: The evolution of the field. Human Resource Management Review, 19(2), 6485.CrossRefGoogle Scholar
Lindgren, M. & Packendorff, J. (2006). What’s new in new forms of organizing? On the construction of gender in project-based work. Journal of Management Studies, 43(4), 841866.Google Scholar
Lundin, R. & Steinthórsson, R. (2003). Studying organizations as temporary. Scandinavian Journal of Management, 19(2), 233250.Google Scholar
Marchington, M. (2015). Analysing the forces shaping employee involvement and participation (EIP) at organisation level in liberal market economies (LMEs). Human Resource Management Journal, 25(1), 118.Google Scholar
McCann, L., Granter, E., Hassard, J., & Hyde, P. (2014). “You can’t do both—something will give”: Limitations of the targets culture in managing UK healthcare workforces. Human Resource Management, 54(5), 773791. doi: 10.1002/hrm.21701.Google Scholar
Medina, R., & Medina, A. (2014). The project manager and the organisation’s long-term competence goal. International Journal of Project Management. (8), 14591470.Google Scholar
Meijerink, J., Bondarouk, T., & Looise, J. K. (2013). Value creation through HR shared services: Towards a conceptual framework. Personnel Review, 42(2), 154175. doi: doi:10.1108/00483481311309366.Google Scholar
Minbaeva, D. B. (2005). Negative impact of HRM complementarity on knowledge transfer in MNCs. Paper presented at the 31st EIBA Annual Conference, December, Oslo, Norway.Google Scholar
Nishii, L. H. & Wright, P. M. (2007). Variability within organizations: Implications for strategic human resource management. (CAHRS Working Paper #07–02). Ithaca, NY: Cornell University, School of Industrial and Labor Relations, Center for Advanced Human Resource Studies.Google Scholar
Paauwe, J. (2004). HRM and Performance: Achieving Long-Term Viability. Oxford: Oxford University Press.Google Scholar
Palm, K. & Lindahl, M. (2015). A project as a workplace: Observations from project managers in four R&D and project-intensive companies. International Journal of Project Management, 33(4), 828838. 10.1016/j.ijproman.2014.10.002.Google Scholar
Peters, P. & Lam, W. (2015). Can employability do the trick? Revealing paradoxical tensions and responses in the process of adopting innovative employability enhancing policies and practices in organizations. Zeitschrift für Personalforschung, 29(3/4), 235258.Google Scholar
Pinto, J. K., Dawood, S., & Pinto, M. B. (2014). Project management and burnout: Implications of the demand–control–support model on project-based work. International Journal of Project Management, 32(4), 578589.CrossRefGoogle Scholar
Pohler, D. & Willness, C. (2014). Balancing interests in the search for occupational legitimacy: The HR professionalization project in Canada. Human Resource Management, 53(3), 467488.Google Scholar
Popaitoon, S. & Siengthai, S. (2014). The moderating effect of human resource management practices on the relationship between knowledge absorptive capacity and project performance in project-oriented companies. International Journal of Project Management, 32(6), 908920.Google Scholar
Purcell, J. & Hutchinson, S. (2007). Front-line managers as agents in the HRM-performance causal chain: Theory, analysis and evidence. Human Resource Management Journal, 17(1), 320.CrossRefGoogle Scholar
Ramsay, H., Scholarios, D., & Harley, B. (2000). Employees and high-performance work systems: Testing inside the black box. British Journal of industrial relations, 38(4), 501531.Google Scholar
Renwick, D. (2003). Line manager involvement in HRM: An inside view. Employee Relations, 25(3), 262280.Google Scholar
Sanders, K., Shipton, H., & Gomes, J. F. S. (2014). Guest editors’ introduction: Is the HRM process important? Past, current, and future challenges. Human Resource Management, 53(4), 489503. doi: 10.1002/hrm.21644.Google Scholar
Söderlund, J. & Bredin, K. (2006). HRM in project-intensive firms: Changes and challenges. Human Resource Management, 45(2), 249265.Google Scholar
Swart, J., & Kinnie, N. (2014). Reconsidering boundaries: Human resource management in a networked world. Human Resource Management, 53(2), 291310.Google Scholar
Sydow, J., Lindkvist, L., & DeFillippi, R. (2004). Editorial: Project organizations, embeddedness and repositories of knowledge. Organization Studies, 25(9), 14751489.Google Scholar
Tabassi, A. A. & Bakar, A. (2009). Training, motivation, and performance: The case of human resource management in construction projects in Mashhad, Iran. International Journal of Project Management, 27(5), 471480.Google Scholar
Tabassi, A. A., Ramli, M., & Bakar, A. H. A. (2012). Effects of training and motivation practices on teamwork improvement and task efficiency: The case of construction firms. International Journal of Project Management, 30(2), 213224.Google Scholar
Tadić, M., Bakker, A. B., & Oerlemans, W. G. (2014). Challenge versus hindrance job demands and well-being: A diary study on the moderating role of job resources. Journal of Occupational and Organizational Psychology, 88(4), 702725. doi: 10.1111/joop.12094.Google Scholar
Thompson, M. & Heron, P. (2006). Relational quality and innovative performance in R&D based science and technology firms. Human Resource Management Journal, 16(1), 2847.Google Scholar
Turner, R., Huemann, M., & Keegan, A. (2007). Human Resource Management in the project-oriented organization. Newtown Square: PMI.Google Scholar
Turner, R., Huemann, M., & Keegan, A. (2008). Human resource management in the project-oriented organisation: Employee wellbeing and ethical treatment. International Journal of Project Management, 26(5/2008), 577585.Google Scholar
Turner, R. & Müller, R. (2003). On the nature of the project as a temporary organization International Journal of Project Management, 21(1), 18.Google Scholar
Vicentini, F. & Boccardelli, P. (2014). Team composition and project-based organizations: New perspectives for human resource management. In Russ, M. (Ed.), Management, valuation, and risk for human capital and human assets: Building the foundation for a multi-disciplinary, multi-level theory, 37.Google Scholar
Watson, T. J. (2010). Critical social science, pragmatism and the realities of HRM. The International Journal of Human Resource Management, 21(6), 915931.Google Scholar
Wickramasinghe, V. & Liyanage, S. (2013). Effects of high performance work practices on job performance in project-based organizations. Project Management Journal, 44(3), 6477.Google Scholar
Winch, G. M. (2014). Three domains of project organising. International Journal of Project Management, 32(5), 721731.Google Scholar
Wright, P. M. & Boswell, W. R. (2002). Desegregating HRM: A review and synthesis of micro and macro human resource management research. Journal of Management, 28(3), 247276.CrossRefGoogle Scholar
Yukl, G. (2012). Leadership: What is it? In Rowe, G. & Guerrero, L. (Eds.), Cases in Leadership. 3rd Ed. Thousand Oaks, CA: Sage, 142.Google Scholar
Zhang, F., Zuo, J., & Zillante, G. (2013). Identification and evaluation of the key social competencies for Chinese construction project managers. International Journal of Project Management, 31(5), 748759.Google Scholar
Zika-Viktorsson, A., Sundström, P., & Engwall, M. (2006). Project overload: An exploratory study of work and management in multi-project settings. International Journal of Project Management, 24(5), 385394.CrossRefGoogle Scholar
Zwikael, O. & Unger-Aviram, E. (2010). HRM in project groups: The effect of project duration on team development effectiveness. International Journal of Project Management, 28(5), 413421. doi: 10.1016/j.ijproman.2009.09.005.Google Scholar

References

Aaltonen, K., Kujala, J., Havela, L., & Savage, G. (2015). Stakeholder dynamics during the project front-end: The case of nuclear waste repository projects. Project Management Journal, 46(6), 1541.Google Scholar
Andersen, E. S. & Jessen, S. A. (2003). Project maturity in organizations. International Journal of Project Management, 21, 457461.Google Scholar
Ang, K. & Killen, C. (2016). Multi-stakeholder perspectives of value in project portfolios. EURAM 2016. Paris, France, 1–4 June.Google Scholar
Aubry, M., Hobbs, B., & Thuillier, D. (2007). A new framework for understanding organisational project management through PMO. International Journal of Project Management, 25(4), 328336.Google Scholar
Axelrod, R. (1984). The Evolution of Cooperation, Basic Books, New York.Google Scholar
Barnard, C. I. (1938/1974), The Functions of the Executive, 30th anniversary edition, 1974 ed., Harvard University Press, Cambridge, MA.Google Scholar
Beringer, C., Jonas, D., & Kock, A. (2013). Behavior of internal stakeholders in project portfolio management and its impact on success. International Journal of Project Management, 31, 830846.Google Scholar
Blichfeldt, B. S. & Eskerod, P. (2008). Project portfolio management – There’s more to it than what management enacts. International Journal of Project Management, 26(4), 357365.Google Scholar
Blomquist, T. & Packendorff, J. (1998). Learning from renewal projects: content, context, and embeddedness. In Lundin, R., & Midler, C. (Eds.), Projects as Arenas for Renewal and Learning Processes. Kluwer Academic Publishers, Dordrecht, 3746.Google Scholar
Bosse, D. A., Phillips, R. A., & Harrison, J. S. (2009). Stakeholders, reciprocity, and firm performance. Strategic Management Journal, 30(4), 447456.Google Scholar
Checkland, P. (1999). Systems Thinking, Systems Practice. John Wiley & Sons Ltd, Chichester.Google Scholar
Checkland, P. & Winter, M. (2006). Process and content: Two ways of using SSM. The Journal of the Operational Research Society, 57(12), 14351441.Google Scholar
Chia, R. (2013). Paradigms and perspectives on organizational project management research: Implications for knowledge-creation. In Drouin, N., Müller, R., & Sankaran, S. (Eds.). Novel Approaches to Organizational Project Management Research: Translational and Transformational. Copenhagen Business School Press, Copenhagen, Denmark, 3355.Google Scholar
Cleland, D. I. (1985). A strategy for ongoing project evaluation. Project Management Journal, 16(3), 1117.Google Scholar
Cleland, D. I. (1986). Project stakeholder management. Project Management Journal, 17(4), 3644.Google Scholar
Cooke-Davies, T. J., Schlichter, J., & Bredillet, C. N. (2001). Beyond the PMBOK Guide, Project Management Institute (PMI) conference, First to the Future, Nashville, 1–10 November.Google Scholar
Cyert, R. M. & March, J. G. (1992). A Behavioral Theory of the Firm, Blackwell, London, UK.Google Scholar
Davis, K. (2014). Different stakeholder groups and their perceptions of project success. International Journal of Project Management, 32(2), 189201.Google Scholar
Davis, K. (2016). A method to measure success dimensions relating to individual stakeholder groups. International Journal of Project Management, 34(3), 480493.Google Scholar
Deng, X., Kang, J., & Low, B. S. (2013). Corporate social responsibility and stakeholder value maximization: Evidence from mergers. Journal of Financial Economics, 110(1), 87109.Google Scholar
Engwall, M. (1995). Jakten på det Effektiva Projektet. Nerenius & Santérus, Stockholm, Sweden (in Swedish).Google Scholar
Engwall, M. (2003). No project is an island: linking projects to history and context, Research Policy, 32, 789808.Google Scholar
Eskerod, P. (2014). Stakeholder understanding and perception of fairness: Enriching project management with strategy concepts. In Lundin, R. A. & Hällgren, M. (Eds.), Advancing Research on Projects and Temporary Organizations, Copenhagen, Denmark: Copenhagen Business School Press, 3951.Google Scholar
Eskerod, P., Huemann, M., & Ringhofer, C. (2015a). Stakeholder inclusiveness – Enriching project management with general stakeholder theory. Project Management Journal, 46(6), 4253.Google Scholar
Eskerod, P., Huemann, M. & Savage, G. (2015b). Project stakeholder management – Past and present. Project Management Journal, 46(6), 614.Google Scholar
Eskerod, P. & Jepsen, A.L. (2013). Project Stakeholder Management. Gower, Aldershot, United Kingdom.Google Scholar
Eskerod, P. & Larsen, T. (2016) Advancing theorizing about project stakeholders by the concept ‘Shadows of the Context’. EURAM 2016. Paris, France, 1–4 June.Google Scholar
Fearon, J. D. (1998). Bargaining, enforcement, and international cooperation. International Organization, 52(2), 269305.Google Scholar
Freeman, R. E. (1984). Strategic management: a stakeholder approach. Pitman/Ballinger, Boston.Google Scholar
Gemünden, H. G. (2015). Foundations of project management research: Stakeholders and agile. Project Management Journal, 46(6), 35.Google Scholar
Huemann, M., Eskerod, P., & Ringhofer, C. (2016). RETHINK! Project Stakeholder Management. Newtown Square, PA: Project Management Institute.Google Scholar
Littau, P., Jujagiri, N.J., & Adlbrecht, G. (2010). 25 years of stakeholder theory in project management literature (1984–2009). Project Management Journal, 41(4), 1729.Google Scholar
March, J. G. & Heath, C. (1994). A primer on decision making: How decisions happen, The Free Press, New York.Google Scholar
Mitchell, R. K., Agle, B. R., & Wood, D. J. (1997). Toward a theory of stakeholder identification and salience: defining the principle of who and what really counts. Academy of Management Review, 22(4), 853886.Google Scholar
van Offenbeek, M. A. G. & Vos, J. F. J. (2016). An integrative framework for managing project issues across stakeholder groups. International Journal of Project Management, 34(1), 4457.Google Scholar
PMI (Project Management Institute) (2013). A Guide to the Project Management Body of Knowledge (PMBOK Guide), 5th ed., Project Management Institute, Newtown Square, PA.Google Scholar
Purvis, R. L., Zagenczyk, T. J., & McCray, G. E. (2015). What’s in it for me? Using expectancy theory and climate to explain stakeholder participation, its direction and intensity. International Journal of Project Management, 33(1), 314.Google Scholar
Rhenman, E. (1964). Företagsdemokrati och företagsorganisation. Thule, Stockholm, Sweden. (in Swedish).Google Scholar
Rowley, T. J. & Moldoveanu, M. (2003). When will stakeholder groups act? An interest- and identity-based model of stakeholder group mobilization, Academy of Management Review, 28(2), 204219.Google Scholar
Simon, H. A. (1956). Rational Choice and the Structure of the Environment, Psychological Review, 63(2), 129138.Google Scholar
Slatter, S. S. P. (1980). Strategic Planning for Public Relations, Long Range Planning, 13(3): 5760.Google Scholar
Smith, A. (2008). Wealth of Nations. An Inquiry into the Nature and Causes of the Wealth of Nations: A Selected Edition, 2008 edition, edited by Sutherland, K.. Oxford: Oxford Paperbacks. Originally published in 1776.Google Scholar
Steinfort, P. (2010). Understanding the antecedents of project management best practice-lessons to be learned from aid relief projects. PhD thesis, School of Property, Construction and Project Management, RMIT University, Melbourne.Google Scholar
Steinfort, P. & Walker, D. H. T. (2011). What Enables Project Success: Lessons from Aid Relief Projects. Project Management Institute, Newtown Square, PA.Google Scholar
Strong, K. C., Ringer, R. C., & Taylor, S. A. (2001). THE* rules of stakeholder satisfaction (*timeliness, honesty, empathy). Journal of Business Ethics, 32(3), 219230.Google Scholar
Walker, D., Steinfort, P., & Maqsood, R. S. T. (2014). Stakeholder voices through rich pictures. International Journal of Managing Projects in Business, 7(3), 342361.Google Scholar
Walker, D. H. T. & Steinfort, P. (2013). Using an improved rich pictures approach to improve project situational analysis in complex aid reconstruction development projects. International Journal of Disaster Resilience in the Built Environment, 4(2), 182198.Google Scholar

References

Alvesson, M. & Sveningsson, S. (2003). The great disappearing act: Difficulties in doing “leadership.” Leadership Quarterly, 14(3), 359381, http://dx.doi.org/10.1016/S1048-9843(03)00031-6.Google Scholar
Bandura, A. (1977). Toward a unifying theory of behavioral change. Psychological Review, 84(2), 191215. doi:10.1037/0033-295X.84.2.191.Google Scholar
Bandura, A. (1982). Self-efficacy mechanism in human agency. American Psychologist, 37(2), 122147. doi:10.1037/0003-066X.37.2.122.Google Scholar
Bass, B. M. (1990). Handbook of Leadership: Theory, Research and Applications. New York: Free Press.Google Scholar
Bennis, W. & Nanus, B. (1985). Leaders: The Strategies for Taking Charge. New York: Harper and Row.Google Scholar
Blomquist, T., Hällgren, M., Nilsson, A., & Söderholm, A. (2010). Project-as-practice: In search of project management research that matters. Project Management Journal, 41(1), 516.Google Scholar
Bolden, R. (2011). Distributed leadership in organizations: A review of theory and research. International Journal of Management Reviews, 13(3), 251269.Google Scholar
Burke, C. S., Fiore, S. M., & Salas, E. (2003). The role of shared cognition in enabling shared leadership and team adaptability. In Pearce, C. L. & Conger, J. A. (Eds.), Shared Leadership. Thousand Oaks, CA: SAGE Publications, 103122Google Scholar
Carroll, B., Levy, L., & Richmond, D. (2008). Leadership as practice: Challenging the competency paradigm. Leadership, 4(4), 363379, http://dx.doi.org/10.1177/1742715008095186.Google Scholar
Cavaleri, S., & Reed, F. (2008). Leading dynamically complex projects. International Journal of Managing Projects in Business, 1(1), 7187, http://dx.doi.org/10.1108/17538370810846423.Google Scholar
Cicmil, S., Williams, T., Thomas, J., & Hodgson, D. (2006) Rethinking project management: Researching the actuality of projects. International Journal of Project Management, 24(8), 675686, http://dx.doi.org/10.1016/j.ijproman.2006.08.006.Google Scholar
Collinson, D. (2000). Fifty Major Philosophers. London, UK: Routledge.Google Scholar
Cope, J., Kempster, S., & Parry, K. (2011). Exploring distributed leadership in the small business context. International Journal of Management Reviews, 13(3), 270285, http://dx.doi.org/10.1111/j.1468-2370.2011.00307.x.Google Scholar
Covey, S. R. (1992). Principle Centered Leadership. New York, Fireside.Google Scholar
Cox, J. F., Pearce, C. L., & Perry, M. L. (2003). Toward a model of shared leadership and distributed influence in the innovation process: How shared leadership can enhance new product development team dynamics and effectiveness. In Pearce, C. L. & Conger, J. A. (Eds.), Shared Leadership, Thousand Oaks, CA: SAGE Publications, 4876.Google Scholar
Crevani, L. (2015). Relational Leadership. In Carroll, B., Ford, J., Taylor, S. (Ed.), Leadership: Contemporary Critical Perspectives, London: Sage Publications.Google Scholar
Crevani, L., Lindgren, M., & Packendorff, J. (2007). Shared leadership: A post-heroic perspective on leadership as a collective construction. International Journal of Leadership Studies, 3(1), 4067.Google Scholar
Crevani, L., Lindgren, M., & Packendorff, J. (2010). Leadership, not leaders: On the study of leadership as practices and interactions. Scandinavian Journal of Management, 26(1), 7786, http://dx.doi.org/10.1016/j.scaman.2009.12.003.Google Scholar
Cunliffe, A.L. & Eriksen, M. (2011). Relational leadership. Human Relations, 64(11), 14251449.Google Scholar
Denis, J.-L., Lamothe, L., & Langley, A. (2001). The dynamics of collective leadership and strategic change in pluralistic organizations. Academy of Management Journal, 44(4), 809837, http://dx.doi.org/10.2307/3069417.Google Scholar
Denis, J. L., Langley, A., & Sergi, V. (2012). Leadership in the plural. Academy of Management Annals, 6(1), 211283, http://dx.doi.org/10.1080/19416520.2012.667612.Google Scholar
De Paoli, D., Vaagaasar, A., & Müller, R. (2013). Project leadership and work space. In Söderlund, J. & Müller, R. (Eds.), Proceedings of IRNOP XI (International Research Network for Organizing by Projects), June 16–17, 2013. Oslo, Norway.Google Scholar
Drath, W., McCauley, C., Palus, C., Van Velsor, E., O’Connor, P., & McGuire, J. (2008). Direction, alignment, commitment: Toward a more integrative ontology of leadership. Leadership Quarterly, 19(6), 635653, http://dx.doi.org/10.1016/j.leaqua.2008.09.003.Google Scholar
Dulewicz, V. & Higgs, M. (2003). Leadership at the top: The need for emotional intelligence in organizations. International Journal of Organizational Analysis, 11(3), 194210.Google Scholar
Dulewicz, V. & Higgs, M. (2005). Assessing leadership styles and organisational context. Journal of Managerial Psychology, 20(2), 105123. doi:10.1108/02683940510579759.CrossRefGoogle Scholar
Endres, S. & Weibler, J. (2016). Towards a three-component model of relational social constructionist leadership: A systematic review and critical interpretive synthesis. International Journal of Management Reviews, doi:10.1111/ijmr.12095.Google Scholar
Fletcher, J. K. (2004). The paradox of postheroic leadership: An essay on gender, power, and transformational change. Leadership Quarterly, 15(5), 647661, http://dx.doi.org/10.1016/j.leaqua.2004.07.004.Google Scholar
Gaddis, P. O. (1959). The project manager. Harvard Business Review, 1959 (May–June), 8997.Google Scholar
Goleman, D., Boyatzis, R., & McKee, A. (2002). Primal leadership: Learning to Lead with Emotional Intelligence. Boston: Harvard Business School Press.Google Scholar
Gronn, P. (2002). Distributed leadership as a unit of analysis. Leadership Quarterly, 13(4), 423451, http://dx.doi.org/10.1016/S1048-9843(02)00120-0.Google Scholar
Hansen, H., Ropo, A., & Sauer, E. (2007). Aesthetic leadership. The Leadership Quarterly, 18(6), 544560. doi:10.1016/j.leaqua.2007.09.003.Google Scholar
Hauschildt, J., Keim, G., & Medcof, J. W. (2000). Realistic criteria for project manager selection and development. Project Management Journal, 31(3), 2332.Google Scholar
Havermans, L. A., Den Hartog, D. N., Keegan, A., & Uhl-Bien, M. (2015) Exploring the role of leadership in enabling contextual ambidexterity. Human Resource Management, 54(S1), s179s200, http://dx.doi.org/10.1002/hrm.21764.Google Scholar
Houghton, J. D., Neck, C. P., & Manz, C. C. (2003). Self-leadership and superleadership. In Pearce, C. L. & Conger, J. A. (Eds.), Shared Leadership, Thousand Oaks, CA: SAGE Publications Inc, USA, 123140.Google Scholar
Huxham, C. & Vangen, S. (2000). Leadership in the shaping and implementation agendas: How things happen in a collaboration (not quite) joined-up world. Academy of Management Journal, 43(6), 11591175, http://dx.doi.org/10.2307/1556343.Google Scholar
Keegan, A. & Den Hartog, D. N. (2004). Transformational leadership in a project-based environment: a comparative study of the leadership styles of project managers and line managers. International Journal of Project Management, 22(8), 609618, http://dx.doi.org/10.1016/j.ijproman.2004.05.005.Google Scholar
Lindgren, M. & Packendorff, J. (2009). Project leadership revisited: Towards distributed leadership perspectives in project research. International Journal of Project Organisation and Management, 1(3), 285308.Google Scholar
Lindgren, M. & Packendorff, J. (2011). Issues, responsibilities and identities: A distributed leadership perspective on biotechnology R&D management. Creativity and Innovation Management, 20(3), 157170, http://dx.doi.org/10.1504/IJPOM.2009.027540.Google Scholar
Manz, C. C. (1986). Self-leadership: Toward an expanded theory of self-influence processes in organizations. Academy of Management Review, 11(3), 585600. doi:10.2307/258312.Google Scholar
Maslow, A. H. (1943). A theory of human motivation. Psychological Review, 50(4), 370396, http://dx.doi.org/10.1037/h0054346.Google Scholar
Mayer, R. C., Davis, J. H., & Schoorman, F. D. (1995). An integrative model of organizational trust. Academy of Management Review, 20(3), 709734, http://dx.doi.org/10.2307/258792.Google Scholar
Mehra, A., Smith, B. R., Dixon, A. L., & Robertson, B. (2006). Distributed leadership in teams: The network of leadership perceptions and team performance. The Leadership Quarterly, 17(3), 232245, http://dx.doi.org/10.1016/j.leaqua.2006.02.003.Google Scholar
Müller, R., Nikolova, N., Sankaran, S., Zhu, F., Xu, X., Vaagaasar, A. L., & Drouin, N. (2016). Leading projects by balancing vertical and horizontal leadership – International Case Studies. In Proceedings of EURAM 2016 (European Academy of Management) Conference. June 1–4, 2016, Paris, France.Google Scholar
Müller, R. & Turner, J. R. (2004). Cultural differences in project owner–manager communication. In Slevin, D. P., Cleland, D. L., & Pinto, J. K. (Eds.), Innovations: Project Management Research 2004. Newton Square, PA: Project Management Institute, 403418.Google Scholar
Müller, R. & Turner, J. R. (2010a). Leadership competency profiles of successful project managers. International Journal of Project Management, 28(5), 437448, http://dx.doi.org/10.1016/j.ijproman.2009.09.003.Google Scholar
Müller, R. & Turner, J. R. (2010b). Project-Oriented Leadership. Aldershot, UK: Gower Publishing.Google Scholar
Ouchi, W. G. (1980). Markets, bureaucracies and clans. Administrative Science Quarterly, 25, 129–14, http://dx.doi.org/10.2307/23922311.Google Scholar
Packendorff, J., Crevani, L., & Lindgren, M. (2014) Project leadership in becoming: A process study of an organizational change project. Project Management Journal, 45(3), 520, http://dx.doi.org/10.1002/pmj.21418.CrossRefGoogle Scholar
Pearce, C. L., & Conger, J. A. (2003). Shared Leadership. Thousand Oaks, CA: Sage Publications.Google Scholar
Pearce, J. L. & Sims, H. P. (2000). Shared Leadership: Toward a multi-level theory of leadership. In Beyerlein, M. M. (Ed.), Team Development, 7th ed., Elsevier Science Inc, 115139.Google Scholar
PMI. (2016). The accidental project manager. Retrieved January 1, 2016, from www.pmi.org/learning/professional-development/career-central/the-accidental-project-manager.aspx.Google Scholar
Raelin, J. A. (2011). From leadership-as-practice to leaderful practice. Leadership, 7(2), 195211, http://dx.doi.org/10.1177/1742715010394808.Google Scholar
Toor, S.-R. & Ofori, G. (2008). Leadership for future construction industry: Agenda for authentic leadership. International Journal of Project Management, 26(6), 620630. doi:10.1016/j.ijproman.2007.09.010.Google Scholar
Turner, J. R. (2009). The Handbook of Project-Based Management: Leading Strategic Change in Organisations, 3rd ed., New York: McGraw-Hill.Google Scholar
Turner, J. R. & Müller, R. (2004). Communication and co-operation on projects between the project owner as principal and the project manager as agent. European Management Journal, 22(3), 327336, http://dx.doi.org/10.1016/j.emj.2004.04.010.Google Scholar
Turner, J. R. & Müller, R. (2006). Choosing Appropriate Project Managers: Matching Their Leadership Style to the Type of Project. Newtown Square, PA: Project Management Institute.Google Scholar
Uhl-Bien, M. (2006). Relational leadership theory: Exploring the social processes of leadership and organizing. Leadership Quarterly, 17(6), 654676, http://dx.doi.org/10.1016/j.leaqua.2006.10.007.Google Scholar

References

Aapaoja, A., Herrala, M., Pekuri, A., & Haapasalo, H. (2013). The characteristics of and cornerstones for creating integrated teams. International Journal of Managing Projects in Business, 6(4), 695713, http://dx.doi.org/10.1108/IJMPB-09-2012-0056.Google Scholar
Adams, S. L. & Anantatmula, V. (2010). Social and behavioral influences on team process. Project Management Journal, 41(4), 8998, http://dx.doi.org/10.1002/pmj.20192.Google Scholar
Alderfer, C. P. (1977). Improving organizational communication through long-term intergroup intervention. The Journal of Applied Behavioral Science, 13(2), 193210, http://dx.doi.org/10.1177/002188637701300207.Google Scholar
Anantatmula, V. S. & Shrivastav, B. (2012). Evolution of project teams for Generation Y workforce. International Journal of Managing Projects in Business, 5(1), 926, http://dx.doi.org/10.1108/17538371211192874.Google Scholar
Argote, L. & McGrath, J. E. (1993). Group processes in organizations: Continuity and change., International Review of Industrial and Organizational Psychology, 8, 333389.Google Scholar
Baiden, B. K., Price, A. D., & Dainty, A. R. (2006). The extent of team integration within construction projects. International Journal of Project Management, 24(1), 1323, http://dx.doi.org/10.1016/j.ijproman.2005.05.001.Google Scholar
Bandura, A. (1994). Self‐efficacy, in Ramachandran, V. S. (Ed.), Encylopedia of Human Behaviour, New York: Academic Press, 4, 7181E.Google Scholar
Bandura, A. (1997). Self-Efficacy: The Exercise of Control. New York: Freeman.Google Scholar
Belbin, R. M. (2012). Management Teams: Why They Succeed and Fail, Abingdon, Routledge.Google Scholar
Berg, M.E. & Karlsen, J.T. (2014). How project managers can encourage and develop positive emotions in project teams. International Journal of Managing Projects in Business, 7(3), 449472, http://dx.doi.org/10.1108/IJMPB-01-2013-0003.Google Scholar
Bourgault, M., Drouin, N., Hamel, E. (2008). Decision-making within distributed project teams: An exploration of formalization and autonomy as determinants of success. Project Management Journal, 39 (S1), S97S110, http://dx.doi.org/10.1002/pmj.20063.Google Scholar
Bourgault, M., Drouin, N., Daoudi, J., Hamel, E. (2009). Understanding Decision-Making within Distributed Project Teams, Upper Darby, PA: PMI Publications.Google Scholar
Buvik, M. P. & Rolfsen, M. (2015). Prior ties and trust development in project teams–A case study from the construction industry. International Journal of Project Management, 33(7), 14841494. http://dx.doi.org/10.1016/j.ijproman.2015.06.002.Google Scholar
Child, J. (2005). Organization: Contemporary Principles and Practice. Malden, MA: Blackwell.Google Scholar
Chiocchio, F., Forgues, D., Paradis, D., & Iordanova, I. (2011). Teamwork in integrated design projects: Understanding the effects of trust, conflict, and collaboration on performance. Project Management Journal, 42(6), 7891, http://dx.doi.org/10.1002/pmj.20268.Google Scholar
Chiocchio, F., Kelloway, E. K., & Hobbs, B. (2015). The Psychology and Management of Project Teams, Oxford: Oxford University Press.Google Scholar
Clark, K. B. & Wheelwright, S. C. (1992). Organizing and leading “heavyweight” development teams. California Management Review, 34(3), 928, http://dx.doi.org/10.1002/pmj.20268.Google Scholar
Cohen, S. G. & Bailey, D. E. (1997). What makes teams work: Group effectiveness research from the shop floor to the executive suite. Journal of Management, 23(3), 239290, http://dx.doi.org/10.1177/014920639702300303.Google Scholar
Connaughton, S. L., Williams, E. A., Shuffler, M. L. (2011). Social identity issues in multiteam systems: Considerations for future research. In Zaccaro, S. J., Marks, M. A., & DeChurch, L. A. (Eds.) Multi-Team Systems: An Organization Form for Dynamic and Complex Environments, Abingdon, Routledge, 109140.Google Scholar
Devine, D. J. (2002). A review and integration of classification systems relevant to teams in organizations. Group Dynamics: Theory, research, and practice, 6(4), 291332, http://dx.doi.org/10.1037/1089-2699.6.4.291.Google Scholar
Devine, D. J., Clayton, L. D., Philips, J. L., Dunford, B. B., & Melner, S. B. (1999). Teams in organizations prevalence, characteristics, and effectiveness. Small Group Research, 30(6), 678711, http://dx.doi.org/10.1177/104649649903000602.Google Scholar
Drouin, N. & Bourgault, M. (2013). How organizations support distributed project teams: Key dimensions and their impact on decision-making and teamwork effectiveness. Journal of Management Development, 33(8), 865885, http://dx.doi.org/10.1108/JMD-07-2012-0091.Google Scholar
Drouin, N., Sankaran, S., Müller, R. (2016). The nature of organizational project management and its role as an organizational capability. 16th EURAM, Paris, 1–4 June.Google Scholar
Englund, R. & Graham, R. (1997). Creating an Environment for Successful Projects: The Quest to Manage Project Management, San Francisco, CA: Jossey-Bass.Google Scholar
Eskerod, P. & Blichfeldt, B. S. (2005). Managing team entrees and withdrawals during the project life cycle. International Journal of Project Management, 23(7), 495503, http://dx.doi.org/10.1016/j.ijproman.2004.12.005.Google Scholar
Gelbard, R. & Carmeli, A. (2009). The interactive effect of team dynamics and organizational support on ICT project success. International Journal of Project Management, 27(5), 464470, http://dx.doi.org/10.1016/j.ijproman.2008.07.005.Google Scholar
Gilley, J. W., Morris, M. L., Waite, A. M., Coates, T., & Veliquette, A. (2010). Integrated theoretical model for building effective teams. Advances in Developing Human Resources, 12(1), 728, http://dx.doi.org/10.1177/1523422310365309.Google Scholar
Hackman, J. R. (1990). Groups that Work and Those That Don’t, San Francisco, CA: Jossey-Bass.Google Scholar
Hackman, J. R. (1992). Group Influences on Individuals in Organizations, Palo Alto, CA: Consulting Psychologists Press.Google Scholar
Henderson, L. S. (2008). The impact of project managers’ communication competencies: Validation and extension of a research model for virtuality, satisfaction, and productivity on project teams. Project Management Journal, 39(2), 4859, http://dx.doi.org/10.1002/pmj.20044.Google Scholar
Hoegl, M., & Weinkauf, K. (2005). Managing task interdependencies in multi‐team projects: A longitudinal study. Journal of Management Studies, 42(6), 12871308, http://dx.doi.org/10.1111/j.1467-6486.2005.00542.x.Google Scholar
Hoegl, M., Weinkauf, K., & Gemuenden, H. G. (2004). Interteam coordination, project commitment, and teamwork in multiteam R&D projects: A longitudinal study. Organization Science, 15(1), 3855, http://dx.doi.org/10.1287/orsc.1030.0053.CrossRefGoogle Scholar
Hollenbeck, J. R., Ilgen, D. R., Sego, D. J., Hedlund, J., Major, D. A., & Phillips, J. (1995). Multilevel theory of team decision making: Decision performance in teams incorporating distributed expertise. Journal of Applied Psychology, 80(2), 292316, http://dx.doi.org/10.1037/0021-9010.80.2.292.Google Scholar
Hsu, J. S., Chang, J. Y., Klein, G., & Jiang, J. J. (2011). Exploring the impact of team mental models on information utilization and project performance in system development. International Journal of Project Management, 29(1), 112, http://dx.doi.org/10.1016/j.ijproman.2009.12.001.Google Scholar
Jassawalla, A. R. & Sashittal, H. C. (1999). Building collaborative cross-functional new product teams. The Academy of Management Executive, 13(3), 5063.Google Scholar
Katzenbach, J. R. & Smith, D. K. (1993). The Wisdom of Teams: Creating the High-Performance Organization, Boston: Harvard Business Press.Google Scholar
Kozlowski, S. W. & Bell, B. S. (2008). Team learning, development, and adaptation In Sessa, V. I. & London, M. (Eds.), Work Group Learning, Mahwah, NJ: LEA, 1544.Google Scholar
Kozlowski, S. W., Gully, S. M., McHugh, P. P., Salas, E., & Cannon-Bowers, J. A. (1996). A dynamic theory of leadership and team effectiveness: Developmental and task contingent leader roles. Research in Personnel and Human Resources Management, 14, 253306.Google Scholar
Kozlowski, S. W., Gully, S. M., Nason, E. R., & Smith, E. M. (1999). Developing adaptive teams: A theory of compilation and performance across levels and time. In Ilgen, D. R., & Pulakos, E. D. (Eds.), The Changing Nature of Performance: Implications for Staffing, Motivation, and Development. San Francisco, CA: Jossey Bass, 240292,Google Scholar
Kozlowski, S. W. & Ilgen, D. R. (2006). Enhancing the effectiveness of work groups and teams. Psychological Science in the Public Interest, 7(3), 77124.Google Scholar
Lawler, E. E. III (1996). From the Ground Up: Six Principles for Building the New Logic Corporation. Jossey-Bass Inc, San Francisco, CA.Google Scholar
Lin, T-C., Chen, C-M., Hsu, J. S-C., & Fu, T-W. (2015). The impact of team knowledge on problem solving competence in information systems development team, International Journal of Project Management, 33 (8), 16921703, http://dx.doi.org/10.1016/j.ijproman.2015.07.007.Google Scholar
Loo, R. (2003). Assessing “team climate” in project teams. International Journal of Project Management, 21(7), 511517, http://dx.doi.org/10.1016/S0263-7863(02)00058-3.Google Scholar
Mathieu, J., Maynard, M. T., Rapp, T., & Gilson, L. (2008). Team effectiveness 1997–2007: A review of recent advancements and a glimpse into the future. Journal of Management, 34(3), 410476, http://dx.doi.org/10.1177/0149206308316061.Google Scholar
Mathieu, J. E. & Schulze, W. (2006). The influence of team knowledge and formal plans on episodic team process-performance relationships. Academy of Management Journal, 49(3), 605619, http://dx.doi.org/10.5465/AMJ.2006.21794678.CrossRefGoogle Scholar
Messner, W. (2015). Measuring existent intercultural effectiveness in global teams. International Journal of Managing Projects in Business, 8(1), 107132, http://dx.doi.org/10.1108/IJMPB-05-2014-0044.Google Scholar
McDonough, E. F. (2000). Investigation of factors contributing to the success of cross-functional teams. Journal of Product Innovation Management, 17, 221235. doi: 10.1111/1540-5885.1730221.Google Scholar
McGrath, J. E. (1964). Social Psychology: A Brief Introduction, New York: Holt, Rinehart & Winston.Google Scholar
McGrath, J. E. (1991). Time, interaction, and performance (tip): A theory of groups. Small Group Research, 22(2), 147174. doi: 10.1177/1046496491222001.Google Scholar
Mueller, J. (2015). Formal and informal practices of knowledge sharing between project teams and enacted cultural characteristics. Project Management Journal, 46(1), 5368, http://dx.doi.org/10.1002/pmj.21471.Google Scholar
Müller, R., Spang, K., & Ozcan, S. (2009). Cultural differences in decision making in project teams. International Journal of Managing Projects in Business, 2(1), 7093, http://dx.doi.org/10.1108/17538370910930527.Google Scholar
Müller, R. (2016). Organizational project governance. In Müller, R. (Ed.), Governance and Governmentality for Projects: Enablers, Practices and Consequences. New York, NY: Routledge.Google Scholar
Nordqvist, S., Hovmark, S., & Zika-Viktorsson, A. (2004). Perceived time pressure and social processes in project teams. International Journal of Project Management, 22(6), 463468.Google Scholar
Ochieng, E. G. & Price, A. D. F. (2010). Managing cross-cultural communication in multicultural construction project teams: The case of Kenya and UK. International Journal of Project Management, 28(5), 449460, http://dx.doi.org/10.1016/j.ijproman.2003.11.005.Google Scholar
Peterson, T. M. (2007). Motivation: How to increase project team performance. Project Management Journal, 38(4), 6069, http://dx.doi.org/10.1002/pmj.20019.Google Scholar
Powell, A., Piccoli, G., & Ives, B. (2004). Virtual teams: A review of current literature and directions for future research. Database for Advances in Information Systems, 35(1), 636, http://dx.doi.org/10.1145/968464.968467.Google Scholar
Project Management Institute (2004). A Guide to the Project Management Body of Knowledge: (PMBOK guide), Upper Darby, PA: PMI.Google Scholar
Project Management Institute (2008). A Guide to the Project Management Body of Knowledge (PMBOK guide), Upper Darby, PA: PMI.Google Scholar
Raghuram, S., Garud, R., Wiesenfeld, B., & Gupta, V. (2001). Factors contributing to virtual work adjustment. Journal of Management, 27(3), 383405, http://dx.doi.org/10.1177/014920630102700309.Google Scholar
Ratcheva, V. (2009). Integrating diverse knowledge through boundary spanning processes–The case of multidisciplinary project teams. International Journal of Project Management, 27(3), 206215, http://dx.doi.org/10.1016/j.ijproman.2008.02.008.Google Scholar
Salas, E., Dickinson, T. L., Converse, S. A., & Tannenbaum, S. I. (1992). Toward an understanding of team performance and training. In In Swezey, R. W. & Salas, E. (Eds.), Teams: Their Training and Performance. Norwood, NJ: Ablex, 329Google Scholar
Schneider, A. (1995). Project management in international teams: instruments for improving cooperation. International Journal of Project Management, 13(4), 247251, http://dx.doi.org/10.1016/0263-7863(95)00022-I.Google Scholar
Shapira, A., Laufer, A., & Shenhar, A. J. (1994). Anatomy of decision making in project planning teams. International Journal of Project Management, 12(3), 172182, http://dx.doi.org/10.1016/0263-7863(94)90033-7.Google Scholar
Shazi, R., Gillespie, N., & Steen, J. (2015). Trust as a predictor of innovation network ties in project teams. International Journal of Project Management, 33(1), 8191, http://dx.doi.org/10.1016/j.ijproman.2014.06.001.Google Scholar
Shelley, A. (2012). Metaphor interactions to develop team relationships and robustness enhance project outcomes. Project Management Journal, 43(6), 8896, http://dx.doi.org/10.1002/pmj.21305.Google Scholar
Shelton, P. M., Waite, A. M., & Makela, C. J. (2010). Highly effective teams: A relational analysis of group potency and perceived organizational support. Advances in Developing Human Resources, 12(1), 93114, http://dx.doi.org/10.1177/1523422310365665.Google Scholar
Sommerville, J. & Dalziel, S. (1998). Project teambuilding—the applicability of Belbin’s team-role self-perception inventory. International Journal of Project Management, 16(3), 165171, http://dx.doi.org/10.1016/S0263-7863(97)00054-9.Google Scholar
Tesluk, P. E., & Mathieu, J. E. (1999). Overcoming roadblocks to effectiveness: Incorporating management of performance barriers into models of work group effectiveness. Journal of Applied Psychology, 84(2), 200217, http://dx.doi.org/10.1037/0021-9010.84.2.200.Google Scholar
Thamhain, H. J. (1999). Effective project leadership in complex self-directed team environments. In Systems Sciences, 1999. HICSS-32. Proceedings of the 32nd Annual Hawaii International Conference on System Sciences. IEEE.Google Scholar
Thamhain, H. (2008). Team leadership effectiveness in technology-based project environments. IEEE Engineering Management Review, 36(1), 165180., http://dx.doi.org/10.1109/EMR.2008.4490148.Google Scholar
Thamhain, H. J. (2012). The changing role of team leadership in multinational project environments. Revista de Gestão E Projetos – GeP, 3(2), 438, doi:10.5585/gep.v3i2.110.Google Scholar
Tseng, T. L. B., Huang, C. C., Chu, H. W., & Gung, R. R. (2004). Novel approach to multi-functional project team formation. International Journal of Project Management, 22(2), 147159, http://dx.doi.org/10.1016/S0263-7863(03)00058-9.Google Scholar
Turner, J. R. & Müller, R. (2005). The Project Manager’s Leadership Style as a Success Factor on Projects: A Literature Review, Newtown Square, PA: Project Management Institute.Google Scholar
Zhang, L., & Cheng, J. (2015). Effect of knowledge leadership on knowledge sharing in engineering project design teams: the role of social capital. Project Management Journal, 46(5), 111124, http://dx.doi.org/10.1002/pmj.21525.Google Scholar

References

Anselmo, J. & Hedden, C. (2011, Aug 22). Up & down: A workforce in transition: Commercial companies hire as defense and space pare down. Aviation Week & Space Technology, 4453.Google Scholar
Aerospace Safety Advisory Panel. (2011). Annual Report. Washington, DC: NASA, 2011.Google Scholar
Bell, J. S. (1987). Speakable and Unspeakable in Quantum Mechanics. Cambridge: Cambridge University Press.Google Scholar
Busenitz, L. W. & Barney, J. B. (1997). Differences between entrepreneurs and managers in large organizations: Biases and heuristics in strategic decision-making. Journal of Business Venturing, 12, 930.Google Scholar
Davenport, T. & Prusak, L. (1998). Working Knowledge. Boston, MA: Harvard Business School Press.Google Scholar
Dragland, A. (2013). Big data – for better or worse. Retrieved from www.sintef.no/home/corporate-news/Big-Data-for-better-or-worse/.Google Scholar
Duarte, D., Lewis, A. Crossman, D., & Hoffman, E. (1995). A career development model for project management workforces. Journal of Career Development, 22(2), 149164.Google Scholar
First break all the rules: The charms of frugal innovation. The Economist. The Economist Newspaper Ltd. Apr 15, 2010.Google Scholar
Hackett, B. (2000). Beyond Knowledge Management: New Ways to Work and Learn (Research Report 1262–00-RR). New York: The Conference Board.Google Scholar
Hoffman, E., Boyle, J. (2013). Tapping agency culture to advance knowledge services at NASA. The Public Manager, Fall, 42(3).Google Scholar
Kahneman, D. (2013). Thinking, Fast and Slow. New York: Farrar, Straus and Giroux.Google Scholar
Kirkpatrick, M. (2010, Aug 04). Google, privacy and the new explosion of data. Retrieved from http://techonomy.typepad.com/blog/2010/08/google-privacy-and-the-new-explosion-of-data.html.Google Scholar
National Aeronautics and Space Administration. Columbia Accident Investigation Report: Volume 1. Washington, DC: GPO, 2003.Google Scholar
National Aeronautics and Space Administration. NASA Policy Directive 7120.6: Knowledge Policy on Programs and Projects. Washington, DC: NASA, 2013.Google Scholar
Neffinger, J. & Kohut, M. (2013). Compelling People: The Hidden Qualities That Make Us Influential. New York: Hudson Street Press.Google Scholar
Polanyi, M. (1966). The Tacit Dimension. University of Chicago Press: Chicago, 4.Google Scholar
Project Management Institute. (2013). A Guide to the Project Management Body of Knowledge: PMBOK Guide (5th Ed.). Newtown Square, PA: Project Management Institute.Google Scholar
Project Management Institute. (2014). Pulse of the profession in-depth report: The high cost of low performance. February 2014.Google Scholar
Vaughan, D. (1996). The Challenger Launch Decision: Risky Technology, Culture, and Deviance at NASA. Chicago: University of Chicago Press.Google Scholar

References

Abraham, M., Sullivan, T., & Griffin, D. (2002). Implementing NAGPRA: The effective management of legislated change in museums. Management Decision, 40(1), 3549.Google Scholar
Alsene, E. (1998). Internal changes and project management structures within enterprises. International Journal of Project Management, 17(6), 367376.Google Scholar
Ansari, S. & Bell, J. (2009). Five easy pieces: A case study of cost management as organizational change. Journal of Accounting & Organizational Change, 5(2), 139167.Google Scholar
Appelbaum, S., Habashy, S., Malo, J. & Shafiq, H. (2012). Back to the future: Revisiting Kotter’s 1996 change model. Journal of Management Development, 31(8), 764782.Google Scholar
Aubry, M., Hobbs, B., & Thuillier, D. (2007). A new framework for understanding organizational project management through PMO. International Journal of Project Management, 25(4), 328336.Google Scholar
Beeson, I. & Davies, C. (2000). Emergence and accomplishment in organizational change. Journal of Organizational Change Management, 13(2), 178189.Google Scholar
Boddy, D. & Macbeth, D. (2000). Prescriptions for managing change: A survey of their effects in projects to implement collaborative working between organizations. International Journal of Project Management, 18(5), 297306.Google Scholar
Brisson-Banks, C. (2010). Managing change and transitions: A comparison of different models and their commonalities. Library Management, 31(4/5), 241252.Google Scholar
Buchanan, D. (1993). Review of “A strategy of change: Concepts and controversies in the management of change.” Journal of Management Studies, 30(4), 684686.Google Scholar
Brocklesby, J. (1997). Becoming multimethodology literate: An assessment of the cognitive difficulties of working across paradigms. In Mingers, J. & Gill, A. (Eds.) Multimethodology: The Theory and Practice of Combining Management Science Methodologies. 189216. Chichester: John Wiley & Sons.Google Scholar
Burrell, G. & Morgan, G. (1979). Sociological Paradigms and Organisational Analysis. Aldershot, England: Gower Publishing.Google Scholar
Casey, M. M., Payne, W. R., & Eime, R. M. (2012). Organisational readiness and capacity building strategies of sporting organisations to promote health. Sport Management Review, 15(1) 109124.Google Scholar
Cegielski, C., Hall, D., & Rebman, C. (2006). Enterprise resource planning systems implementation success. International Journal of Information Systems and Change Management, 1(3): 301317.Google Scholar
Checkland, P. & Holwell, S. (1998). Information, Systems, and Information Systems: Making Sense of the Field. Chichester: Wiley.Google Scholar
Chia, R. (2013). Paradigms and Perspectives on Organizational Project management Research: Implications for knowledge-creation. In Drouin, N., Müller, R., &, Sankaran, S. (Eds.), Novel Approaches to Organizational Project Management Research: Translational and Transformational Copenhagen: Copenhagen Business School Press, 3355.Google Scholar
Choi, S., Holmberg, I., Lowstedt, J., & Brommels, M. (2011). Executive management in radical change – The case of the Karolinska University Hospital merger. Scandinavian Journal of Management, 27(1), 1123.Google Scholar
Connor, D. (1993). Managing at the Speed of Change. Random House.Google Scholar
Crawford, L. (2011). Adding change implementation to the project manager’s toolkit, In Proceedings of the Annual Project Management Australia Conference (PMOz): Project Management at the Speed of Light, Sydney, NSW, 2–5 August, 2011.Google Scholar
Crawford, L. & Nahmias, A. H. (2010). Competencies for managing change. International Journal of Project Management 28(4), 405412.Google Scholar
Day, M., & Atkinson, D. (2004). Large-scale transitional procurement change in the aerospace industry. Journal of Purchasing & Supply Management, 10(6), 257268.Google Scholar
Drouin, N., Sankaran, S., & Müller, R. (2016). The nature of organizational project management and its role as an organizational capability. EURAM, 1–4 June, 2016, Paris, France.Google Scholar
Fahri, J., Biesenthal, C., Pollack, J., & Sankaran, S. (2015). Understanding megaproject success beyond the project close-out stage. Construction Economics and Building, 15(3), 4858.Google Scholar
Garfein, S. J. & Sankaran, S. (2011). Work preferences of project and program managers, change managers and project team members: The importance of knowing the difference, In PMI Global Congress, Dallas, Texas, 22–25 October 2011.Google Scholar
Goede, M. (2011). Globalization of small islands: The role models of Curacao. International Journal of Commerce and Management, 21(2), 192212.Google Scholar
Gupta, P. (2011). Leading innovation change: The Kotter way. International Journal of Innovation Science, 3(3), 141149.Google Scholar
Hiatt, J. (2006). ADKAR: a Model for Change in Business, Government and Our Community. Loveland, Colorado, Prosci Learning Centre Publications.Google Scholar
Hornstein, H. (2015). The integration of project management and organizational change management is now a necessity. International Journal of Project Management, 33, 291298.Google Scholar
Jarocki, T. (2011). The Next Evolution – Enhancing and Unifying Project and Change Management. San Francisco: Brown and Williams.Google Scholar
Kloppenborg, T. & Opfer, W. (2002). The current state of project management: Trends, interpretations, and predictions. Project Management Journal, 33(2), 518.Google Scholar
Kotter, J. (1996). Leading Change. Boston, Harvard Business School Press.Google Scholar
Lehmann, V. (2010). Connecting changes to projects using a historical perspective: Towards some new canvases for researchers. International Journal of Project Management, 28, 328338.Google Scholar
Levasseur, R. (2010). People skills: Ensuring project success – A change management perspective. Interfaces, 40(2), 159162.Google Scholar
Leybourne, S. (2006). Improvisation within the project management of change: Some Observations from UK financial services. Journal of Change Management, 6(4), 365381.Google Scholar
Leybourne, S. (2007). The changing bias of project management research: A consideration of the literatures and an application of extant theory. Project Management Journal, 38(1), 6173.Google Scholar
Mento, A., Jones, R., & Dirndorfer, W. (2002). A change management process: Grounded in both theory and practice. Journal of Change Management, 3(1): 4559.Google Scholar
Mingers, J. (1997a). Multi-paradigm multimethodology. In, Mingers, J. & Gill, A. (Eds.), ultimethodology: The Theory and Practice of Combining Management Science Methodologies, 120. Chichester: John Wiley & Sons.Google Scholar
Mingers, J. (1997b). Towards critical pluralism. In, Mingers, J. & Gill, A. (Eds.), Multimethodology: The Theory and Practice of Combining Management Science Methodologies, 407440. Chichester, John Wiley & Sons.Google Scholar
Mingers, J. (2003). The paucity of multimethod research: A review of the information systems literature. Information Systems Journal, 13(3), 233249.Google Scholar
Mingers, J. & Brocklesby, J. (1997). Multimethodology: Towards a framework for mixing methodologies. Omega, International Journal of Management Science, 25(5), 489509.Google Scholar
Morris, P. (2002). Science, objective knowledge, and the theory of project management. Proceedings of the ICE – Civil Engineering, 150(2), 8290.Google Scholar
Morris, P. (2013). Reconstructing project management reprised: A knowledge perspective. Project Management Journal, 44(5), 623.Google Scholar
Munro, I. & Mingers, J. (2002). The use of multimethodology in practice – results of a survey of practitioners. Journal of the Operational Research Society, 53, 369378.Google Scholar
Nitta, K., Wrobel, S., Howard, J., & Jimmerson-Eddings, E. (2009). Leading change of a school district organization. Public Performance & Management Review, 32(3), 463488.Google Scholar
Pádár, K., Pataki, B., & Sebestyen, Z. (2011). A comparative analysis of stakeholder and role theories in project management and change management. International Journal of Management Cases, 14: 252260.Google Scholar
Parker, D. W., Charlton, J., Ribeiro, A., & Pathak, R.D. (2013). Integration of project-based management and change management: Intervention methodology. International Journal of Production Performance Management, 62(5), 534544.Google Scholar
Pillay, J., Hackney, R., & Braganza, A. (2012). Informing strategic IS change: Towards a ‘meta-learning’ framework. Journal of Strategic Information Systems, 21(1), 5871.Google Scholar
Phillips, J. (1983). Enhancing the effectiveness of organizational change management. Human Resource Management, 22(1–2), 183199.Google Scholar
PMI (2013a). Managing Change in Organizations: A Practice Guide. Newtown Square, PA, Project Management Institute.Google Scholar
PMI (2013b). A Guide to the Project Management Body of Knowledge, 5th Ed. Newtown Square, Project Management Institute.Google Scholar
Pollack, J. & Adler, D. (2015). Emergent trends and passing fads in project management research: A scientometric analysis of changes in the field. International Journal of Project Management, 33, 236248: doi: 10.1016/j.ijproman.2014.04.011.Google Scholar
Pollack, J. & Algeo, C. (2014a). A comparison of project manager and change manager involvement in organisational change project activities and stages. Journal of Modern Project Management, 2(2), 817.Google Scholar
Pollack, J. & Algeo, C. (2014b). Perspectives on formal authority between project managers and change managers. Project Management Journal, 45(5), 2743, doi: 10.1002/pmj.21446.Google Scholar
Pollack, J. & Algeo, C. (2016). Project managers’ and change managers’ contribution to success. International Journal of Managing Projects in Business, 9(2), 451465, http://dx.doi.org/10.1108/IJMPB-09-2015-0085.Google Scholar
Pollack, J. & Pollack, R. (2015). Using Kotter’s eight stage process to manage an organisational change program: Presentation and practice. Systemic Practice and Action Research, 28, 5166. DOI 10.1007/s11213-014-9317-0.Google Scholar
Raineri, A. (2011). Change management practices: Impact on perceived change results. Journal of Business Research, 64, 266272.Google Scholar
Reed, M. (1985). Redirections in Organizational Analysis. London, Tavistok.Google Scholar
Sankaran, S. & Agarwal, R. (2012) Rethinking project management goals and methods to suit service systems. Proceedings of the 56th Annual Meeting of the ISSS, 114.Google Scholar
Sikorko, P. (2008). Transforming library and higher education support services: Can change models help? Library Management, 29(4/5), 307318.Google Scholar
Smith, I. (2011). Orgnaisational quality and organisational change: Interconnecting paths to effectiveness. Library Management, 32(1), 111128.Google Scholar
Söderlund, J. (2010). Knowledge entrainment and project management: The case of large-scale transformation projects. International Journal of Project Management, 28(2), 130141.Google Scholar
Stewart, J. & Kringas, P. (2003). Change management: Strategy and values in six agencies from the Australian Public Service. Public Administration Review, 63(6), 675688.Google Scholar
Turner, R. & Cochrane, R. (1993). Goals-and-methods matrix: Coping with projects with ill defined goals and/or methods of achieving them. International Journal of Project Management, 11(2), 93102.Google Scholar
Urli, B. & Urli, D. (2000). Project management in North America, stability of the concepts. Project Management Journal, 31(3), 3343.Google Scholar
White, L. & Taket, A. (1997). Critiquing multimethodology as metamethodology: Working towards pragmatic pluralism. In, Mingers, J. & Gill, A. (Eds.) Multimethodology: The Theory and Practice of Combining Management Science Methodologies, 379405. Chichester: John Wiley & Sons.Google Scholar
Winch, G., Meunier, M., Head, J., & Russ, K. (2012). Projects as the content and process of change: The case of the health safety laboratory. International Journal of Project Management, 30(2), 141152.Google Scholar
Wolstenholme, E. (1999). Qualitative vs quantitative modelling: The evolving balance. Journal of the Operational Research Society, 50, 422428.Google Scholar
Yeo, K. T. (1993). Systems thinking and project management – time to reunite, International Journal of Project Management, 11(2), 111117.Google Scholar

References

Adenfelt, M. (2010). Exploring the performance of transnational projects: Shared knowledge, coordination and communication. International Journal of Project Management, 28(6), 529538, http://dx.doi.org/10.1016/j.ijproman.2009.10.004.Google Scholar
Adenfelt, M. & Lagerström, K. (2006). Enabling knowledge creation and sharing in transnational projects. International Journal of Project Management, 24(3), 191198, http://dx.doi.org/10.1016/j.ijproman.2005.09.003.Google Scholar
Aibinu, A., Ofori, G., & Ling, F. (2008). Explaining cooperative behavior in building and civil engineering projects’ claims process: Interactive effects of outcome favorability and procedural fairness. Journal of Construction Engineering and Management, 134(9), 681691, http://dx.doi.org/10.1061/(ASCE)0733-9364.Google Scholar
Autry, C. W., Skinner, L. R., & Lamb, C. W. (2008). Interorganizational citizenship behaviors: An empirical study. Journal of Business Logistics, 29(2), 5374, http://dx.doi.org/10.1002/j.2158-1592.2008.tb00087.x.Google Scholar
Bolden, R. (2011). Distributed leadership in organizations: A review of theory and research. International Journal of Management Reviews, 13(3), 251269, http://dx.doi.org/10.1111/j.1468-2370.2011.00306.x.Google Scholar
Bolino, M. C., Turnley, W. H., & Bloodgood, J. M. (2002). Citizenship behavior and the creation of social capital in organizations. Academy of Management Review, 27(4), 505522, http://dx.doi.org/10.5465/AMR.2002.7566023.Google Scholar
Borman, W. C. & Motowidlo, S. J. (1993). Expanding the criterion domain to include elements of contextual performance. In Schmitt, N. & Borman, W. C. (Eds.), Personnel Selection in Organizations. San Francisco: Jossey-Bass, 7198.Google Scholar
Bosch-Sijtsema, P. M. & Henriksson, L.-H. (2014). Managing projects with distributed and embedded knowledge through interactions. International Journal of Project Management, 32(8), 14321444, http://dx.doi.org/10.1016/j.ijproman.2014.02.005.Google Scholar
Brady, T. & Davies, A. (2004). Building project capabilities: From exploratory to exploitative learning. Organization Studies, 25(9), 16011621, http://dx.doi.org/10.1177/0170840604048002.Google Scholar
Braun, T., Ferreira, A. I., & Sydow, J. (2013). Citizenship behavior and effectiveness in temporary organizations. International Journal of Project Management, 31, 862876, http://dx.doi.org/10.1016/j.ijproman.2012.09.003.Google Scholar
Braun, T., Müller-Seitz, G., & Sydow, J. (2012). Project citizenship behavior? An explorative analysis at the project-network-nexus. Scandinavian Journal of Management, 24(4), 271284, http://dx.doi.org/10.1016/j.scaman.2012.05.008.Google Scholar
Brief, A. P. & Motowidlo, S. J. (1986). Prosocial organizational behaviors. Academy of Management Review, 11(4), 710725, http://dx.doi.org/10.5465/AMR.1986.4283909.Google Scholar
Chelariu, C., Johnston, W. J., & Young, L. (2002). Learning to improvise, improvising to learn: A process of responding to complex environments. Journal of Business Research, 55(2), 141147, http://dx.doi.org/10.1016/S0148-2963(00)00149-1.Google Scholar
Chiocchio, F., Kelloway, K., & Hobbs, B. (eds., 2015). The Psychology and Management of Project Teams: An Interdisciplinary Perspective, Oxford: Oxford University Press.Google Scholar
Ding, Z., Ng, F., & Li, J. (2014). A parallel multiple mediator model of knowledge sharing in architectural design project teams. International Journal of Project Management, 32(1), 5465, http://dx.doi.org/10.1016/j.ijproman.2013.04.004.Google Scholar
Ehrhart, M. G., Bliese, P. D., & Thomas, J. L. (2006). Unit-level OCB and unit effectiveness: Examining the incremental effect of helping behavior. Human Performance, 9(2), 159173, http://dx.doi.org/10.1207/s15327043hup1902_4.Google Scholar
Ekrot, B., Rank, J., & Gemünden, H. G. (2016). Antecedents of project managers’ voice behavior: The moderating effect of organization-based self-esteem and affective organizational commitment. International Journal of Project Management, 34(6), 10281042, http://dx.doi.org/10.1016/j.ijproman.2015.10.011.Google Scholar
Engwall, M. (2003). No project is an island: Linking projects to history and context. Research Policy, 32(5), 789808, http://dx.doi.org/10.1016/S0048-7333(02)00088-4.Google Scholar
Ferreira, A. I., Braun, T., & Sydow, J. (2013). Citizenship behavior in project-based organizing: Comparing German and Portuguese project managers. International Journal of Human Resource Management, 24(20), 37723793, http://dx.doi.org/10.1080/09585192.2013.777937.Google Scholar
Fong, P. (2008). Can we learn from our past? Managing knowledge within and across projects. In Becerra-Fernandez, I., & Leidner, D. (Eds.), Knowledge Management: An Evolutionary view, Vol. 12. Armonk, NY: ME Sharpe, 204226.Google Scholar
Gallo, M. & Gardiner, P. D. (2007). Triggers for a flexible approach to project management within UK financial services. International Journal of Project Management, 25(5), 446456, http://dx.doi.org/10.1016/j.ijproman.2006.12.004.Google Scholar
George, J. M. & Jones, G. R. (1997). Organizational spontaneity in context. Human Performance, 10(2), 153170, http://dx.doi.org/10.1207/s15327043hup1002_6.Google Scholar
Grimshaw, D., Marchington, M., Rubery, J., & Willmott, H. (2005). Fragmenting work across organizational boundaries. In Marchington, M., Grimshaw, D., Rubery, J., & Willmott, H. (Eds.), Fragmenting Work Blurring Organizational Boundaries and Disordering Hierarchies. Oxford: Oxford University Press, 131.Google Scholar
Gross, U. (2014). Fighting the fire: Improvisational behavior during the production launch of new products. International Journal of Operations & Production Management, 34(6), 722749, http://dx.doi.org/10.1108/IJOPM-08-2012-0306.Google Scholar
Hartmann, A. & Dorée, A. (2015). Learning between projects: More than sending messages in bottles. International Journal of Project Management, 33(2), 341351, http://dx.doi.org/10.1016/j.ijproman.2014.07.006.Google Scholar
Jackson, S. E., Chuang, C.-H., Harden, E. E., Jiang, Y., & Joseph, J. M. (2006). Toward developing human resource management systems for knowledge-intensive teamwork. In Joseph, J. M. (Ed.), Research in Personnel and Human Resources Management, Vol. 25, Amsterdam: JAI, 2770.Google Scholar
Jha, K. N. & Iyer, K. C. (2007). Commitment, coordination, competence and the iron triangle. International Journal of Project Management, 25 (5), 527540, http://dx.doi.org/10.1016/j.ijproman.2006.11.009.Google Scholar
Kissi, J., Dainty, A., & Tuuli, M. (2013). Examining the role of transformational leadership of portfolio managers in project performance. International Journal of Project Management, 31(4), 485497, http://dx.doi.org/10.1016/j.ijproman.2012.09.004.Google Scholar
Koskinen, K. U., Pihlanto, P., & Vanharanta, H. (2003). Tacit knowledge acquisition and sharing in a project work context. International Journal of Project Management, 21(4), 281290, http://dx.doi.org/10.1016/S0263-7863(02)00030-3.Google Scholar
Leybourne, S. (2006). Improvisation within the project management of change: Some observations from UK financial services. Journal of Change Management, 6(4), 365381, http://dx.doi.org/10.1080/14697010601081548.Google Scholar
Leybourne, S. & Sadler-Smith, E. (2006). The role of intuition and improvisation in project management. International Journal of Project Management, 24(6), 483492, http://dx.doi.org/10.1016/j.ijproman.2006.03.007.Google Scholar
Loufrani-Fedida, S. & Missonier, S. (2015). The project manager cannot be a hero anymore! Understanding critical competencies in project-based organizations from a multilevel approach. International Journal of Project Management, 33(6), 12201235, http://dx.doi.org/10.1016/j.ijproman.2015.02.010.Google Scholar
Lundin, R. A. (2011). Researchers of projects and temporary organizations – One happy family? [Editorial]. International Journal of Project Management, 29(4), 357358, http://dx.doi.org/10.1016/j.ijproman.2011.02.009.Google Scholar
Lundin, R. A. & Söderholm, A. (1995). A theory of the temporary organization. Scandinavian Journal of Management, 11(4), 437455, http://dx.doi.org/10.1016/0956-5221(95)00036-U..Google Scholar
Magni, M., Maruping, L. M., Hoegl, M., & Proserpio, L. (2013). Managing the unexpected across space: Improvisation, dispersion, and performance in NPD teams. Journal of Product Innovation Management, 30(5), 10091026, http://dx.doi.org/10.1111/jpim.12043.Google Scholar
Magni, M., Proserpio, L., Hoegl, M., & Provera, B. (2009). The role of team behavioral integration and cohesion in shaping individual improvisation. Research Policy, 38(6), 10441053, http://dx.doi.org/10.1016/j.respol.2009.03.004.Google Scholar
Melkonian, T. & Picq, T. (2010). Opening the “black box” of collective competence in extreme projects: Lessons from the French Special Forces. Project Management Journal, 41(3), 7990, http://dx.doi.org/10.1002/pmj.20181.Google Scholar
Melkonian, T. & Picq, T. (2011). Building project capabilities in PBOs: Lessons from the French special forces. International Journal of Project Management, 29(4), 455467, http://dx.doi.org/10.1016/j.ijproman.2011.01.002.Google Scholar
Midler, C. (1995). “Projectification” of the firm: The Renault case. Scandinavian Journal of Management, 11(4), 363375, http://dx.doi.org/10.1016/0956-5221(95)00035-T.Google Scholar
Moorman, C. & Miner, A. S. (1998). Organizational improvisation and organizational memory. Academy of Management Review, 23(4), 698723, http://dx.doi.org/10.5465/AMR.1998.1255634.Google Scholar
Müller-Seitz, G. (2012). Leadership in interorganizational networks: A literature review and suggestions for future research. International Journal of Management Reviews, 14(4), 428443, http://dx.doi.org/10.1111/j.1468-2370.2011.00324.x.Google Scholar
Müller, J. (2015). Formal and informal practices of knowledge sharing between project teams and enacted cultural characteristics. Project Management Journal, 46(1), 5368, http://dx.doi.org/10.1002/pmj.21471.CrossRefGoogle Scholar
Müller, R., Vaagaasar, A. L., Nikolova, N., Sankaran, S., & Drouin, N. (2015). The socio-cognitive space for linking horizontal and vertical leadership. APROS/EGOS Conference December 9–11, 2015, Sydney, Australia.Google Scholar
Nesheim, T. & Hunskaar, H. M. (2015). When employees and external consultants work together on projects: Challenges of knowledge sharing. International Journal of Project Management, 33(7), 14171424, http://dx.doi.org/10.1016/j.ijproman.2015.06.010.Google Scholar
Organ, D. W., Podsakoff, P. M., & MacKenzie, S. B. (2006). Organizational Citizenship Behavior. Its Nature, Antecedents, and Consequences. Thousand Oaks, CA: Sage.Google Scholar
Park, J.-G. & Lee, J. (2014). Knowledge sharing in information systems development projects: Explicating the role of dependence and trust. International Journal of Project Management, 32(1), 153165, http://dx.doi.org/10.1016/j.ijproman.2013.02.004.Google Scholar
Pearce, C. L. & Herbik, P. A. (2004). Citizenship behavior at the team level of analysis: The effects of team leadership, team commitment, perceived team support, and team size. Journal of Social Psychology, 144(3), 293310, http://dx.doi.org/10.3200/SOCP.144.3.293-310.Google Scholar
Pina e Cunha, M., Vieira da Cunha, J., & Kamoche, K. (1999). Organizational improvisation: What, when, how and why. International Journal of Management Reviews, 1(3), 299341, http://dx.doi.org/10.1111/1468-2370.00017.Google Scholar
Podsakoff, P. M., MacKenzie, S. B., Paine, J. B., & Bachrach, D. G. (2000). Organizational citizenship behaviors: A critical review of the theoretical and empirical literature and suggestions for future research. Journal of Management, 26(3), 513563, http://dx.doi.org/10.1177/014920630002600307.Google Scholar
Ruuska, I. & Teigland, R. (2009). Ensuring project success through collective competence and creative conflict in public–private partnerships – A case study of Bygga Villa, a Swedish triple helix e-government initiative. International Journal of Project Management, 27 (4), 323334, http://dx.doi.org/10.1016/j.ijproman.2008.02.007.Google Scholar
Ruuska, I. & Vartiainen, M. (2003). Critical project competences – A case study. Journal of Workplace Learning, 15(7/8), 307312, http://dx.doi.org/10.1108/13665620310504774.Google Scholar
Ruuska, I. & Vartiainen, M. (2005). Characteristics of knowledge sharing communities in project organizations. International Journal of Project Management, 23(5), 374379, http://dx.doi.org/10.1016/j.ijproman.2005.01.003.Google Scholar
Sage, D., Dainty, A., & Brookes, N. (2014). A critical argument in favor of theoretical pluralism: Project failure and the many and varied limitations of project management. International Journal of Project Management, 32(4), 544555, http://dx.doi.org/10.1016/j.ijproman.2013.08.005.Google Scholar
Söderlund, J. (2008). Competence dynamics and learning processes in project-based firms: Shifting, adapting and leveraging. International Journal of Innovation Management, 12(1), 4167, http://dx.doi.org/10.1142/S1363919608001911.Google Scholar
Söderlund, J. (2011). Pluralism in project management: Navigating the crossroads of specialization and fragmentation. International Journal of Management Reviews, 13(2), 153176, http://dx.doi.org/10.1111/j.1468-2370.2010.00290.x.Google Scholar
Söderlund, J., & Tell, F. (2011). Strategy and capabilities in the P-form corporation: Linking strategic direction with organizational capabilities. In, Cattani, G., Ferriani, S., Frederiksen, L. & Täube, F. (Eds.), Project-Based Organizing and Strategic Management (Advances in Strategic Management, Vol. 28). Bingley: Emerald, 235262.Google Scholar
Stevenson, D. H. & Starkweather, J. A. (2010). PM critical competency index: IT execs prefer soft skills. International Journal of Project Management, 28(7), 663671.Google Scholar
Turner, J. R., & Müller, R. (2005). The project manager’s leadership style as a success factor on projects: A literature review. Project Management Journal, 36(2), 4961, http://dx.doi.org/10.1016/j.ijproman.2009.11.008.Google Scholar
Van Dyne, L., Graham, J. W., & Dienesch, R. M. (1994). Organizational citizenship behavior: Construct redefinition, measurement, and validation. Academy of Management Journal, 37(4), 765802, http://dx.doi.org/10.2307/256600.Google Scholar
Wang, S. & Noe, R. A. (2010). Knowledge sharing: A review and directions for future research. Human Resource Management Review, 20(2), 115131, http://dx.doi.org/10.1016/j.hrmr.2009.10.001.Google Scholar
Wang, W.-T., & Ko, N.-Y. (2012). Knowledge sharing practices of project teams when encountering changes in project scope: A contingency approach. Journal of Information Science, 38(5), 423441, http://dx.doi.org/10.1177/0165551512445240.Google Scholar
Wiewiora, A., Murphy, G., Trigunarsyah, B., & Brown, K. (2014). Interactions between organizational culture, trustworthiness, and mechanisms for inter-project knowledge sharing. Project Management Journal, 45(2), 4865, http://dx.doi.org/10.1002/pmj.21407.Google Scholar
Zhang, L., He, J., & Zhou, S. (2013). Sharing tacit knowledge for integrated project team flexibility: Case study of integrated project delivery. Journal of Construction Engineering and Management, 139(7), 795804, http://dx.doi.org/10.1061/(ASCE)CO.1943-7862.0000645.Google Scholar

References

Albers, J. A. & Brewer, S. (2003). Knowledge management and the innovation process: The eco-innovation model. Journal of Knowledge Management Practice, 4(6), 16.Google Scholar
Almeida, M. V. & Soares, A. L. (2014). Knowledge sharing in project-based organizations: Overcoming the informational limbo. International Journal of Information Management, 34(6), 770779.Google Scholar
Association for Project Management. (2006). APM Body of Knowledge, 5th ed. High Wycombe, UK: Association for Project Management.Google Scholar
Australian Institute of Project Management. (2010). Professional Competency Standards for Project Management. Retrieved 13 August, 2016, from www.aipm.com.au/certification/national-certification/competency-standards-for-pm.Google Scholar
Barnes, J. & Liao, Y. (2012). The effect of individual, network, and collaborative competencies on the supply chain management system. International Journal of Production Economics, 140(2), 888899.Google Scholar
Barnes, T., Pashby, I., & Gibbons, A. (2002). Effective university–industry interaction: A multi-case evaluation of collaborative R&D projects. European Management Journal, 20(3), 272285.Google Scholar
Bisk, L. (2002). Formal entrepreneurial mentoring: The efficacy of third party managed programs. Career Development International, 7(5), 262270.Google Scholar
Bourne, L. & Walker, D. H. T. (2004). Advancing project management in learning organizations. Learning Organization, 11(3), 226243.Google Scholar
Brière, S., Proulx, D., Flores, O. N., & Laporte, M. (2015). Competencies of project managers in international NGOs: Perceptions of practitioners. International Journal of Project Management, 33(1), 116125. doi: http://dx.doi.org/10.1016/j.ijproman.2014.04.010.Google Scholar
Brown, C. J. (2008). A comprehensive organisational model for the effective management of project management. South African Journal of Business Management, 39(3), 110.Google Scholar
Cairns, L. (2000). The Process/Outcome Approach to Becoming a Capable Organisation. Paper presented at the Australian Capability Network Conference, Sydney, NSW, Australia.Google Scholar
Calamel, L., Defélix, C., Picq, T., & Retour, D. (2012). Inter-organisational PROJECTS in French innovation clusters: The construction of collaboration. International Journal of Project Management, 30(1), 4859.Google Scholar
Carvalho, M. M. d., Patah, L. A., & de Souza Bido, D. (2015). Project management and Its effects on project success: Cross-country and cross-industry comparisons. International Journal of Project Management, 33(7), 15091522. doi: http://dx.doi.org/10.1016/j.ijproman.2015.04.004.Google Scholar
Chesbrough, H. W. (2006). Open Innovation: The New Imperative for Creating and Profiting from Technology. Boston, MA: Harvard Business School Press.Google Scholar
Chong, E. (2013). Managerial competencies and career advancement: A comparative study of managers in two countries. Journal of Business Research, 66(3), 345353.Google Scholar
Cicmil, S., Williams, T., Thomas, J., & Hodgson, D. (2006). Rethinking project management: Researching the actuality of projects. International Journal of Project Management, 24(8), 675686.Google Scholar
Connell, J., Kriz, A., & Thorpe, M. (2014). Industry clusters: An antidote for knowledge sharing and collaborative innovation? Journal of Knowledge Management, 18(1), 137151.Google Scholar
Connell, J. & Thaarup, C. (2014). Mind Training for the Innovation: Building foundations for creativity in the workplace. In Soliman, F. (Ed.), Learning Models for Innovation in Organizations: Examining Roles of Knowledge Transfer and Human Resources Management: Examining Roles of Knowledge Transfer and Human Resources Management. Hershey, PA: IGI Global, 5271.Google Scholar
Connell, J. & Voola, R. (2010). Size does matter: Collaboration and competitive advantage within a manufacturing and engineering cluster. International Journal of Globalisation and Small Business, 4(1), 6172.Google Scholar
Connell, J. & Voola, R. (2013). Knowledge integration and competitiveness: A longitudinal study of an industry cluster. Journal of Knowledge Management, 17(2), 208225.Google Scholar
Crawford, L., Morris, P., Thomas, J., & Winter, M. (2006). Practitioner development: From trained technicians to reflective practitioners. International Journal of Project Management, 24(8), 722733.Google Scholar
Cummings, J. (2003). Knowledge Sharing: A Review of the Literature. Washington, DC: Operations Evaluation Department, The World Bank.Google Scholar
Drouin, N., Besner, C., Aubry, M., Sicotte, H., Drouin, N., Vidot-Delerue, H., & Besner, C. (2012). Organisational project management as a function within the organisation. International Journal of Managing Projects in Business, 5(2), 180194.Google Scholar
Edum-Fotwe, F. T. & McCaffer, R. (2000). Developing project management competency: Perspectives from the construction industry. International Journal of Project Management, 18(2), 111124. doi: http://dx.doi.org/10.1016/S0263-786390075-8.Google Scholar
Flower, J. (1999). In the mush. Physician Executive, 25(1), 6467.Google Scholar
Freudenberg, B., Brimble, M., & Cameron, C. (2011). WIL and Generic Skill Development: The development of business students’ generic skills through work-integrated learning. Asia-Pacific Journal of Cooperative Education, 12(2), 7993.Google Scholar
Fukuyama, F. (1995). Trust: The Social Virtues and the Creation of Prosperity. New York: Free Press Paperbacks.Google Scholar
Grabher, G. (2004). Temporary architectures of learning: Knowledge governance in project ecologies. Organization studies, 25(9), 14911514.Google Scholar
Hsu, S.-C., Weng, K.-W., Cui, Q., & Rand, W. (2016). Understanding the Complexity of Project Team Member Selection through Agent-based Modeling. International Journal of Project Management, 34(1), 8293. doi: http://dx.doi.org/10.1016/j.ijproman.2015.10.001.Google Scholar
ISO (2011). Draft International Standard ISO/DIS 21500 Guidance on Project Management. Geneva, Switzerland: The International Organization for Standardization ISO, 131.Google Scholar
Jackling, B. & De Lange, P. (2009). Do accounting graduates’ skills meet the expectations of employers? A matter of convergence or divergence. Accounting Education: an international journal, 18(4–5), 369385.Google Scholar
Jonas, D. (2010). Empowering project portfolio managers: How management involvement impacts project portfolio management performance. International Journal of Project Management, 28(8), 818831. doi: http://dx.doi.org/10.1016/j.ijproman.2010.07.002.Google Scholar
Kersiene, K. & Savaneviciene, A. (2015). The formation and management of organizational competence based on cross cultural perspective. Engineering Economics, 65(5), 5666.Google Scholar
Lai, Y.-L., Hsu, M.-S., Lin, F.-J., Chen, Y.-M., & Lin, Y.-H. (2014). The effects of industry cluster knowledge management on innovation performance. Journal of Business Research, 67(5), 734739.Google Scholar
Matlay, H. & Barrett, R. (2006). Small business learning through mentoring: Evaluating a project. Education + Training, 48(8/9), 614626.Google Scholar
Montana, J. P. & Nenide, B. (2008). The evolution of regional industry clusters and their implications for sustainable economic development: Two case illustrations. Economic Development Quarterly, 22(4), 290302.Google Scholar
Monteiro de Carvalho, M. (2013). An investigation of the role of communication in IT projects. International Journal of Operations & Production Management, 34(1), 3664.Google Scholar
Monteiro de Carvalho, M., Patah, L. A., & de Souza Bido, D. (2015). Project management and its effects on project success: Cross-country and cross-industry comparisons. International Journal of Project Management, 33(7), 15091522.Google Scholar
Morris, P. (2000). Researching the Unanswered Questions of Project Management. Paper presented at the PMI Research Conference, Paris, France.Google Scholar
Murphy, J. T. (2006). Building trust in economic space. Progress in Human Geography, 30(4), 427450.Google Scholar
Niu, K.-H. (2010). Organizational trust and knowledge obtaining in industrial clusters. Journal of Knowledge Management, 14(1), 141155.Google Scholar
Organisation for Economic Co-operation and Development. (2005). Business clusters: Promoting enterprise in Central and Eastern Europe. Paris: OECD Publishing.Google Scholar
Parker, G. M., Zielinski, D., & McAdams, J. (2000). Rewarding Teams: Lessons from the Trenches. San Francisco: Jossey-Bass Inc., Publishers.Google Scholar
Parry, S. (1996). The quest for competencies. Training, 33(7), 4854.Google Scholar
Porter, M. E. (1998). Cluster and the new economics of competition. Harvard Business Review, 76(6), 7790.Google Scholar
Project Management Institute. (2013a). A Guide to the Project Management Body of Knowledge (5th ed.). Newtown Square, PA: Project Management Institute.Google Scholar
Project Management Institute. (2013b). The Project Management Body of Knowledge (5th ed.). Newtown Square, PA: Project Management Institute.Google Scholar
Project Management Institute. (2014). Implementing Organizational Project Management: A Practice Guide, Newtown Square, PA: Project Management Institute, 102.Google Scholar
Ramazani, J. & Jergeas, G. (2015). Project managers and the journey from good to great: The benefits of investment in project management training and education. International Journal of Project Management, 33(1), 4152. doi: http://dx.doi.org/10.1016/j.ijproman.2014.03.012.Google Scholar
Schön, D. A. (1987). Educating the Reflective Practitioner. San Francisco, CA: Jossey-Bass.Google Scholar
Silvius, A. G., & Schipper, R. P. (2014). Sustainability in project management competencies: Analyzing the competence gap of project managers. Journal of Human Resource and Sustainability Studies, 2(2), 4058.Google Scholar
Takey, S. M., & Carvalho, M. M. d. (2015). Competency mapping in project management: An action research study in an engineering company. International Journal of Project Management, 33(4), 784796. doi: http://dx.doi.org/10.1016/j.ijproman.2014.10.013.Google Scholar
Tallman, S., Jenkins, M., Henry, N., & Pinch, S. (2004). Knowledge, clusters, and competitive advantage. Academy of management review, 29(2), 258271.Google Scholar
The Macquarie Dictionary. (Ed.) (2009) The Macquarie Dictionary (5 ed.). Sydney: Macquarie Dictionary Publishers.Google Scholar
Trivellas, P. & Drimoussis, C. (2013). Investigating leadership styles, behavioural and managerial competency profiles of successful project managers in Greece. Procedia-Social and Behavioral Sciences, 73, 692700.Google Scholar
Young, M. & Conboy, K. (2013). Contemporary project portfolio management: Reflections on the development of an Australian competency standard for project portfolio management. International Journal of Project Management, 31(8), 10891100.Google Scholar
Yusuf, S. (2008). Can Clusters Be Made to Order? In Yusuf, S., Nabeshima, K. & Yamashita, S. (Eds.), Growing Industrial Clusters in Asia: Serendipity and Science. Washington, DC: The World Bank, 138.Google Scholar

Save book to Kindle

To save this book to your Kindle, first ensure coreplatform@cambridge.org is added to your Approved Personal Document E-mail List under your Personal Document Settings on the Manage Your Content and Devices page of your Amazon account. Then enter the ‘name’ part of your Kindle email address below. Find out more about saving to your Kindle.

Note you can select to save to either the @free.kindle.com or @kindle.com variations. ‘@free.kindle.com’ emails are free but can only be saved to your device when it is connected to wi-fi. ‘@kindle.com’ emails can be delivered even when you are not connected to wi-fi, but note that service fees apply.

Find out more about the Kindle Personal Document Service.

Available formats
×

Save book to Dropbox

To save content items to your account, please confirm that you agree to abide by our usage policies. If this is the first time you use this feature, you will be asked to authorise Cambridge Core to connect with your account. Find out more about saving content to Dropbox.

Available formats
×

Save book to Google Drive

To save content items to your account, please confirm that you agree to abide by our usage policies. If this is the first time you use this feature, you will be asked to authorise Cambridge Core to connect with your account. Find out more about saving content to Google Drive.

Available formats
×