Hostname: page-component-76fb5796d-r6qrq Total loading time: 0 Render date: 2024-04-25T09:26:22.231Z Has data issue: false hasContentIssue false

Relining of the Sidmar blast furnace B in 2001

Published online by Cambridge University Press:  25 October 2002

Get access

Abstract

A certain number of changes have been made on the occasion of the relining of blast furnace B at Ghent. They oncern the design of the furnace and the improvement of its cooling system, the repair of the hot blast stoves, the replacement of part of the control equipment and the installation of new measuring devices. Environmental controls and improved working conditions were also at the origin of some changes. The result of this operation is a fine new furnace equipped with the latest measuring and control systems.

Type
Research Article
Copyright
© La Revue de Métallurgie, 2002

Access options

Get access to the full version of this content by using one of the access options below. (Log in options will check for institutional or personal access. Content may require purchase if you do not have access.)