Hostname: page-component-848d4c4894-jbqgn Total loading time: 0 Render date: 2024-06-21T10:45:45.994Z Has data issue: false hasContentIssue false

Relining of the Sidmar blast furnace A

Published online by Cambridge University Press:  07 May 2004

Get access

Abstract

In 2003, Sidmar commissioned the renewed blast furnace A at the Ghent works. It will operate together with the existing blast furnace B to provide an ironmaking capacity of 4.5 million t/year under optimal circumstances. The furnace was designed and constructed under an engineering contract with Paul Wurth and by a joint Sidmar engineering and project team. This will be the fifth campaign of blast furnace A. This paper describes the relining operations.

Type
Research Article
Copyright
© La Revue de Métallurgie, 2004

Access options

Get access to the full version of this content by using one of the access options below. (Log in options will check for institutional or personal access. Content may require purchase if you do not have access.)