Hostname: page-component-76fb5796d-9pm4c Total loading time: 0 Render date: 2024-04-26T17:19:57.806Z Has data issue: false hasContentIssue false

Long campaign life of CST No. 1 blast furnace

Published online by Cambridge University Press:  26 July 2005

Get access

Abstract

Companhia Siderurgica de Tubarão (CST) No. 1 blast furnace has been in continuous operation for 21 years, accomplishing a high operational performance with high productivity and low fuel consumption. Seeking its biggest challenge of 18,500 t/m3-IV of productivity, several jobs have been developed in order to extend the furnace campaign until 2008. This paper shows the results of these activities and proposes a different concept of hearth wear.

Type
Research Article
Copyright
© La Revue de Métallurgie, 2005

Access options

Get access to the full version of this content by using one of the access options below. (Log in options will check for institutional or personal access. Content may require purchase if you do not have access.)