Hostname: page-component-848d4c4894-jbqgn Total loading time: 0 Render date: 2024-06-23T10:32:11.341Z Has data issue: false hasContentIssue false

Slab caster revamp at UGINE & ALZ Genk: Innovative solutions in project management and first operational results

Published online by Cambridge University Press:  25 June 2004

Get access

Abstract

In November 2000, UGINE&ALZ Genk awarded VAI a contract to upgrade their steelmaking plant. The scope of work included the world's largest stainless steel slab caster designed for an annual output of 1.2 million tons. The existing casting machine had to be replaced within a comprehensive shut-down period of 21 days only to minimize the financial burden due to the production outage. Innovative project management solutions combined with excellent realization resulted in a successful start-up on October 1, 2002, after a shutdown period of only 20 days. Operational results with regard to productivity and quality are discussed.

Type
Research Article
Copyright
© La Revue de Métallurgie, 2004

Access options

Get access to the full version of this content by using one of the access options below. (Log in options will check for institutional or personal access. Content may require purchase if you do not have access.)