Hostname: page-component-848d4c4894-v5vhk Total loading time: 0 Render date: 2024-07-01T13:53:15.366Z Has data issue: false hasContentIssue false

Operational stabilization of continuous casting No. 2 at CST

Published online by Cambridge University Press:  25 June 2004

Get access

Abstract

This project was developed in order to keep the production of the CST Continuous Casting No. 2 steady at 2.8 Mt/year. The main focus was the reduction of segments failure that was caused by short life of bearings, a forth of the time expected. The goal established was well overreached due to a set of improvements made by operation, maintenance, technical unit and engineering: reduction of the number of break-outs; improvements on control and raise of casting speed.

Type
Research Article
Copyright
© La Revue de Métallurgie, 2004

Access options

Get access to the full version of this content by using one of the access options below. (Log in options will check for institutional or personal access. Content may require purchase if you do not have access.)