Blast furnace campaign prolongation philosophiesin Germany

Published online by Cambridge University Press:  12 June 2007

Get access

Abstract

To maximize furnace campaigns and to minimize production downtimes through short lining times, the entire integral blast furnace area, including the auxiliary units, has to be theoretically partitioned. The evolution of measures for extending furnace life is in conjunction with the investigation and understanding of the in some respects very complicated wear mechanisms and their causes. Of most importance are the constructional, material and process engineering measures to reduce wear and the measuring instrumentation for early detection and progress monitoring of wear.

Type
Research Article
Copyright
© La Revue de Métallurgie, 2007

Access options

Get access to the full version of this content by using one of the access options below. (Log in options will check for institutional or personal access. Content may require purchase if you do not have access.)