Hostname: page-component-76fb5796d-zzh7m Total loading time: 0 Render date: 2024-04-25T08:28:09.316Z Has data issue: false hasContentIssue false

Control system overhaul of the gas treatment area at ArcelorMittal CST coke plan

Published online by Cambridge University Press:  15 September 2007

Get access

Abstract

The implementation of the control system overhaul in the gas treatment area in CST is reported. The former analogic system with local switches has been replaced by a Distributed Control System with electronic interfaces. The results achieved are presented.

Type
Research Article
Copyright
© La Revue de Métallurgie, 2007

Access options

Get access to the full version of this content by using one of the access options below. (Log in options will check for institutional or personal access. Content may require purchase if you do not have access.)