Hostname: page-component-8448b6f56d-c47g7 Total loading time: 0 Render date: 2024-04-23T20:43:36.334Z Has data issue: false hasContentIssue false

Ground deformation monitoring at Taiwan Light Source due to the construction of Taiwan Photon Source

Published online by Cambridge University Press:  06 January 2011

K. H. Hsu
Affiliation:
National Synchrotron Radiation Research Center, 101 Hsin-Ann Road, Hsinchu Science Park, Hsinchu 30076, Taiwan, R.O.C.
Y. L. Tsai*
Affiliation:
National Synchrotron Radiation Research Center, 101 Hsin-Ann Road, Hsinchu Science Park, Hsinchu 30076, Taiwan, R.O.C.
C. J. Lin
Affiliation:
National Synchrotron Radiation Research Center, 101 Hsin-Ann Road, Hsinchu Science Park, Hsinchu 30076, Taiwan, R.O.C.
H. S. Wang
Affiliation:
National Synchrotron Radiation Research Center, 101 Hsin-Ann Road, Hsinchu Science Park, Hsinchu 30076, Taiwan, R.O.C.
S. Y. Perng
Affiliation:
National Synchrotron Radiation Research Center, 101 Hsin-Ann Road, Hsinchu Science Park, Hsinchu 30076, Taiwan, R.O.C.
H. C. Ho
Affiliation:
National Synchrotron Radiation Research Center, 101 Hsin-Ann Road, Hsinchu Science Park, Hsinchu 30076, Taiwan, R.O.C.
W. Y. Lai
Affiliation:
National Synchrotron Radiation Research Center, 101 Hsin-Ann Road, Hsinchu Science Park, Hsinchu 30076, Taiwan, R.O.C.
K. H. Hsu
Affiliation:
National Synchrotron Radiation Research Center, 101 Hsin-Ann Road, Hsinchu Science Park, Hsinchu 30076, Taiwan, R.O.C.
T. C. Tseng
Affiliation:
National Synchrotron Radiation Research Center, 101 Hsin-Ann Road, Hsinchu Science Park, Hsinchu 30076, Taiwan, R.O.C.
J. R. Chen
Affiliation:
National Synchrotron Radiation Research Center, 101 Hsin-Ann Road, Hsinchu Science Park, Hsinchu 30076, Taiwan, R.O.C.
*
Email address for correspondence: tsai.yl@nsrrc.org.tw
Get access

Abstract

Taiwan Photon Source is now under construction at NSRRC Taiwan. In order to maintain the Taiwan Light Source (TLS) for normal operation, a hydrostatic levelling system and precision inclination sensor (Leica Nivel 220) were installed both in the storage ring and beamlines to monitor ground deformation arising. This paper presents the monitoring system setup and the circumstances of ground deformation including vertical settlement and floor inclination during the ground breaking period to provide a criterion for TLS operation.

Type
Poster paper
Copyright
Copyright © Diamond Light Source Ltd 2010

Access options

Get access to the full version of this content by using one of the access options below. (Log in options will check for institutional or personal access. Content may require purchase if you do not have access.)

References

REFERENCES

Martin, D., Gatta, G., Perret, B. & Claret, C. 2002 The European Sychrotron radiation facility hydrostatic leveling system – twelve years experience with large scale hydrostatic leveling. In Proceedings of the 7th International Workshop on Accelerator Alignment Spring-8. Hyogo, Japan.Google Scholar
Seryi, A., Ruland, R., Baklakov, B., Chupyra, A., Erokhin, A., Kondaurov, M., Medvedko, A., Parkhomchuk, V., Singatulin, Sh. & Shubin, E. 2001 Hydrostatic level system for slow ground motion studies at FERMILAB and SLA. In Proceedings of the 2001 Particle Accerlerator Conference, Chicago, USA.Google Scholar