Skip to main content Accessibility help
×
Home

Management of TENORM in a crude refinery

  • J. Barescut, D. Lariviere, T. Stocki, F. Devecchi (a1), G. Colombo (a1), R. Fresca Fantoni (a1), E. Rizzio (a1), E. Di Caprio (a2) and S. Macrì (a2)...

Abstract

A multi-step project has been developed by eni r&m to define a TENORM (Technologically Enhanced Naturally Occurring Radioactive Material) management system in refinery plants, compliant with Italian regulations and international guidelines.

The project involves a preliminary survey on refineries to detect, on the basis of the production process, the sections at risk of TENORM accumulation; this analysis is followed by the consequent formation/information to the workers, dose assessment for workers and the public, introduction of radiometric characterization before release of potentially contaminated waste.

Copyright

References

Hide All
[1][1]Norma UNI 10720 “Guida alla scelta e all’uso degli apparecchi di protezione delle vie respiratorie”).
[2][2]European Commission, “Practical use of the concepts of clearance and exemption – Part II: Application of the concepts of exemption and clearance to natural radiation sources, Radiation Protection RP122”, European Commission, Luxemburg (2001).
[3][3]Italian Radiation-Protection Regulations (D. Lgs. 230/95 e s.m.i. All. IV para. 14.1)

Management of TENORM in a crude refinery

  • J. Barescut, D. Lariviere, T. Stocki, F. Devecchi (a1), G. Colombo (a1), R. Fresca Fantoni (a1), E. Rizzio (a1), E. Di Caprio (a2) and S. Macrì (a2)...

Metrics

Full text views

Total number of HTML views: 0
Total number of PDF views: 0 *
Loading metrics...

Abstract views

Total abstract views: 0 *
Loading metrics...

* Views captured on Cambridge Core between <date>. This data will be updated every 24 hours.

Usage data cannot currently be displayed