Hostname: page-component-8448b6f56d-t5pn6 Total loading time: 0 Render date: 2024-04-19T13:39:33.096Z Has data issue: false hasContentIssue false

Status of FINMET plant operation at BHP DRI, Australia (January 2001)

Published online by Cambridge University Press:  25 October 2002

Get access

Abstract

The principle of the FINMET fluidized bed direct-reduction process is reviewed and the two presently built installations are presented. The problems encountered at the start-up of the Port Hedland plant have been solved by modifying the process parameters. With the new operating conditions, production rate and product quality are at the desired level.

Type
Research Article
Copyright
© La Revue de Métallurgie, 2001

Access options

Get access to the full version of this content by using one of the access options below. (Log in options will check for institutional or personal access. Content may require purchase if you do not have access.)