Slag splashing at the Fos steelplant: new converters scheduling and results

  • T. Benoit, R. Comparini, M. Coste, C. Calvo, R. Cadet and J.-C. Huber...

Abstract

Slag splashing is a way of maintaining converters lining, started at the Fos steel plant in December 2003. Systematic slag splashing on converters lining, by nitrogen injection with the top lance, after tapping, protects refractory. The aim of the project is to disconnect the two converters, from the refractory point of view, and to reach a refractory lining lifetime of 5,000 heats.

Copyright

Slag splashing at the Fos steelplant: new converters scheduling and results

  • T. Benoit, R. Comparini, M. Coste, C. Calvo, R. Cadet and J.-C. Huber...

Metrics

Full text views

Total number of HTML views: 0
Total number of PDF views: 0 *
Loading metrics...

Abstract views

Total abstract views: 0 *
Loading metrics...

* Views captured on Cambridge Core between <date>. This data will be updated every 24 hours.

Usage data cannot currently be displayed