Skip to main content Accessibility help
×
Home

Extension of the Ugine & ALZ steel plant at Genk: project review after one year of operation

  • J. Steins, S. Dimitrov, M. Hiebler, J. Krumenacker, M. Thalhammer and O. Schulz...

Abstract

This paper describes the equipments and systems, designed and supplied by VOEST-ALPINE Industrieanlagenbau (VAI), for the extension of the stainless steel production plant of Ugine & ALZ at Genk. The main results obtained during the first year of full operation of this modernized plant are presented.

Copyright

Related content

Powered by UNSILO

Extension of the Ugine & ALZ steel plant at Genk: project review after one year of operation

  • J. Steins, S. Dimitrov, M. Hiebler, J. Krumenacker, M. Thalhammer and O. Schulz...

Metrics

Full text views

Total number of HTML views: 0
Total number of PDF views: 0 *
Loading metrics...

Abstract views

Total abstract views: 0 *
Loading metrics...

* Views captured on Cambridge Core between <date>. This data will be updated every 24 hours.

Usage data cannot currently be displayed.