Hostname: page-component-8448b6f56d-gtxcr Total loading time: 0 Render date: 2024-04-24T17:20:52.218Z Has data issue: false hasContentIssue false

The Cold Ice Tunnel on the Silbersattel, Monte Rosa: 1953 Progress

Published online by Cambridge University Press:  30 January 2017

Rights & Permissions [Opens in a new window]

Abstract

Type
Discussion
Copyright
Copyright © International Glaciological Society 1954

During the summer of 1953 progress on the tunnel was advanced from a length of about 60 m. to close to 100 m., notwithstanding considerable set-backs caused by bad weather.

On reopening the tunnel in June 1953, it was found that the axis of the tunnel had been twisted horizontally and warped vertically as much as three or four meters from its original line; the cross-section of the innermost part of the tunnel, formerly 2 m. high and 1 m. wide, had been compressed to approximately 1.20 m. high and 0.75 m. wide.

Notwithstanding the exposure of the inner walls of the tunnel to air for nearly twelve months, no substantial change in the temperatures of the ice walls was noted on reopening the tunnel (see Journal of Glaciology, Vol. 2, No. 13, April 1953, p. 194–96, for temperature measurements in 1952).

After re-excavating the 1952 structure to full size, progress was advanced during 1953 to a total length of close to wo m., and it is estimated that there is over 70 m. of névé overlying the tunnel at its heading, which would represent a pressure of approximately 100 lb./sq. in. (7.03 kg./cm.2). It was therefore with much surprise that quite a few voids were opened up in this far-in position of the tunnel, voids up to one cubic foot in volume. There was, of course, no unbalanced air pressure in the voids as the bubbly nature of the névé would not permit air under pressure. Occasional small stones of the size of a man’s fist were often found; presumably they were dislodged by the wind during the former lower horizons of the glacier, and were not scoured out from the bed. The temperature of the ice walls throughout this entire advance of the tunnel in 1953 was uniformly between 7° and 8° F. (–13.9° to –13.3° C.).

It is expected to continue the tunnel, with the benefits of these two years of experience, during the summer of 1954., and it is hoped to reach bed-rock before the end of this coming summer.

Parallax in photographs of the location of the portal of the tunnel in 1953, compared with identical photographs in 1952, indicates movement of about 35 m. per annum for this high-altitude glacier. The location of the portal (see photograph on p. 194 of the reference cited above) has since been triangulated from the Gornergrat Stockhorn, so that accurate data on this movement will be available in 1954.