Hardware and networks for Gaia data processing

  • C. Turon, F. Meynadier, F. Arenou, W. O’Mullane (a1), M. Beck (a2), F. De Angeli (a3), J. Hoar (a4), M. Martino (a5), X. Passot (a6) and J. Portell (a7)...

Abstract

A considerable amount of computing power is needed for Gaia data processing during the mission. A pan European system of six data centres are working together to perform different parts of the processing and combine the results. Data processing estimates suggest around 1020 FLOP total processing is required. Data will be transferred daily around Europe and with a final raw data volume approaching 100 TB. With these needs in mind the centres are already gearing up for Gaia. We present the status and plans of the Gaia Data Processing Centres.

Copyright

Hardware and networks for Gaia data processing

  • C. Turon, F. Meynadier, F. Arenou, W. O’Mullane (a1), M. Beck (a2), F. De Angeli (a3), J. Hoar (a4), M. Martino (a5), X. Passot (a6) and J. Portell (a7)...

Metrics

Full text views

Total number of HTML views: 0
Total number of PDF views: 0 *
Loading metrics...

Abstract views

Total abstract views: 0 *
Loading metrics...

* Views captured on Cambridge Core between <date>. This data will be updated every 24 hours.

Usage data cannot currently be displayed