Hostname: page-component-76fb5796d-qxdb6 Total loading time: 0 Render date: 2024-04-25T07:43:51.337Z Has data issue: false hasContentIssue false

ENVIRONMENTAL REVIEWS AND CASE STUDIES: Environmental Reevaluations for Design-Build Highway Projects: Implementing the SR 520 Bridge Replacement and HOV Program

Published online by Cambridge University Press:  10 September 2014

Margaret Kucharski*
Affiliation:
Washington State Department of Transportation (WSDOT) Environmental Lead, SR 520 Bridge Replacement and HOV Program, WSDOT, Seattle, Washington. Rona Spellecacy, American Institute of Certified Planners (AICP), and Environmental Planner, HDR, Inc., Seattle, Washington.
Rona Spellecacy
Affiliation:
Washington State Department of Transportation (WSDOT) Environmental Lead, SR 520 Bridge Replacement and HOV Program, WSDOT, Seattle, Washington. Rona Spellecacy, American Institute of Certified Planners (AICP), and Environmental Planner, HDR, Inc., Seattle, Washington.
*
Address correspondence to: Margaret Kucharski, WSDOT Environmental Lead, SR 520 Bridge Replacement and HOV Program, Washington State Department of Transportation, Wells Fargo Center, 999 Third Avenue, Suite 900, Seattle, WA 98104; (phone) 206-770-3500; (fax) 206-770-3569; (e-mail) KucharM@wsdot.wa.gov.
Get access

Abstract

Design-build projects present unique challenges with respect to environmental documentation and regulatory compliance. This article highlights the use of reevaluations of National Environmental Policy Act (NEPA) documents to address these challenges, drawing on examples from the State Route (SR) 520 Bridge Replacement and High Occupancy Vehicle (HOV) Program (SR 520 Program), in Seattle, Washington. Reevaluations provide a tool with which project proponents can confirm the validity of existing NEPA documentation relatively quickly and efficiently. The Washington State Department of Transportation (WSDOT) and the Federal Highway Administration (FHWA) worked together to develop a reevaluation process that ensures the environmental documentation for the SR 520 Program keeps pace with the design. WSDOT learned valuable lessons through this process, including coordinating early, developing a transition plan, assigning an environmental coordinator, clarifying expectations, and tracking design developments. These recommendations could be useful in future design-build highway projects.

Environmental Practice 00: 1–7 (2014)

Type
Features
Copyright
© National Association of Environmental Professionals 2014 

Access options

Get access to the full version of this content by using one of the access options below. (Log in options will check for institutional or personal access. Content may require purchase if you do not have access.)

References

Barkley, M., and Hansel, J.. 2008. Reevaluations of NEPA Documents. Prepared for the American Association of State Highway and Transportation Officials (AASHTO) Standing Committee on Environment, as part of the National Cooperative Highway Research Program (NCHRP), Transportation Research Board, 85 pp. Available at http://onlinepubs.trb.org/onlinepubs/archive/notesdocs/25-25(28)_FR.pdf (accessed August 22, 2013).Google Scholar
Federal Highway Administration (FHWA). 2005. Safe, Accountable, Flexible, Efficient Transportation Equity Act: A Legacy for Users (SAFETEA-LU). FHWA, Washington, DC. Available at https://www.fhwa.dot.gov/safetealu/ (accessed August 12, 2014).Google Scholar
Smith, L., and Suciu-Smith, D.. 2009. FAQs about NEPA Reevaluations: Part 1 of a 2 Part Series. Environmental Quarterly 5(2):1–2, 5. Available at http://www.fhwa.dot.gov/resourcecenter/teams/environment/publications.cfm (accessed August 22, 2013).Google Scholar
US Department of Transportation (USDOT). 1997. 23 CFR 771.129: Environmental Impact and Related Procedures—Re-evaluations. 1997. USDOT, Washington, DC. Available at http://www.fhwa.dot.gov/legsregs/directives/fapg/cfr0771.htm (accessed August 22, 2013).Google Scholar
US Department of Transportation (USDOT). 2004. 40 CFR 1506.5: Other Requirements of NEPA: Agency Responsibility. USDOT, Washington, DC. Available at http://www.gpo.gov/fdsys/pkg/CFR-2004-title40-vol30/xml/CFR-2004-title40-vol30-part1506.xml (accessed August 26, 2013).Google Scholar
US Department of Transportation (USDOT). 2011. 23 CFR 636: Design-Build Contracting. USDOT, Washington, DC. Available at http://cfr.vlex.com/source/code-federal-regulations-highways-1072/toc/01.07.22 (accessed August 22, 2013).Google Scholar